검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2022.10 구독 인증기관·개인회원 무료
        In this research, KPS manufactured Full System Decontamination (FSD) equipment, which is consisted of Oxidizing Agent Manufacturing System (OAMS), Chemical Injection System (CIS), RadWaste Treatment System (RWTS), Chemical Waste Decomposition & Treatment System (CWDS) and conducted demonstration test to prepare Decontamination and Decommissioning (D&D) project of Kori nuclear power plant in Korea. Each equipment of FSD was modularized due to the limited size of equipment hatch of Kori nuclear power plant. To simulate the expected circumstances in nuclear power plant such as usage of heater or position of each equipment, additional equipment was used. The chemical concentration and flow rate of process water for FSD were used as mentioned in the previous study by KHNP CRI. FSD was conducted for three cycles and each cycle was consisted of oxidation, reduction, chemical decomposition and purification. Oxidation and reduction process were conducted at 90°C. Chemical decomposition and purification process were conducted at 40°C due to the damage of UV lamp and IX by the heat. Total volume of process water for FSD demonstration test was 2.5 m2. KPS conducted decontamination performance review by calculating thickness reduction and weight loss of installed specimen. Operational review was conducted as if FSD test was conducted in the field based on the result of demonstration test. One of the most prioritized features is the workers’ safety. Also, the appropriate position of equipment needs to be considered to meet the required specification of component.
        2.
        2022.10 구독 인증기관·개인회원 무료
        In the pilot scale test, the two scale-up factors (Electric energy per order EEO, Electric energy per mass EEM) were conducted to design the Chemical Waste Decomposition & Treatment System (CWDS). The CWDS consist of two kind UV lamp reactors to improve the decomposition rate of oxalic acid, which are low pressure amalgam UV lamp and medium pressure UV lamp. The two reactors were connected in series, and the hydrogen peroxide is mixed through a line mixer at the front of the reactor and injected into the reactors. The CWDS was connected with the full system decontamination equipment to purify the residual oxalic acid after chemical decontamination process. The full system decontamination equipment were included Oxidizing Agent Manufacturing System (OAMS), Chemical Injection System (CIS), RadWaste Treatment System (RWTS) to operate the Oxidation/Reduction decontamination process and purify the process water. After decontamination process, the waste water will be cooled down into the 40°C and passed through the UV reactor at 110 gpm with hydrogen peroxide injection. The concentration of waste water is expected oxalic acid 1,700 ~ 2,000 ppm, Iron 5 ~ 20 ppm. As a result of the CBD test in the laboratory with simulated waste liquid, the amount of Low pressure amalgam lamp UV dose required to decompose 95% of oxalic acid in 2 m2 waste water was up to 1,800 mJ/cm2. The amount of medium pressure lamp UV dose was up to 450 mJ/cm2 at the same condition. We conducted demonstration test using 2 m2 waste water after the oxidation/reduction decontamination process, the decomposition rate 95% was obtained by low pressure amalgam UV lamp and medium pressure UV lamp reactor each.