검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2018.05 구독 인증기관·개인회원 무료
        The Semi-Rigid Pavement (SRP) mixture is composed of Gap Graded Asphalt (GGA) mixture (air void = 20~28%) and cement paste. By inserting cement paste into voids in GGA mixture, SRP can provide not only flexibility but also rigidity characteristics on pavement performance. SRP can mitigate pavement surface temperature increase during summer session, provide better smoothness and mitigate rutting distress due to heavy weight vehicles, successfully. In Japan, SRP is widely applied in cross section area, heavy vehicle parking lot and highway ticketing booth in highway network system. In South Korea, SRP was introduced and applied since 2005. However, still more researches and studies are needed to understand material characteristics and improve performance of SRP. Moreover, the current SRP system in South Korea merely follows and adapts the aggregate gradation information from Japan which needs to be amended and customized into original material (i.e. aggregate, binder and cement) situation of South Korea. In this paper, SRP system based on Stone Mastic Asphalt (SMA) mixture design originated from Korea Expressway Corporation (KEC) and enhanced cement paste with addition of fly-ash and slags was developed. In addition, an optimized proportion between asphalt mixture air voids and cement paste amount with consideration of economic benefit was introduced. Based on field evaluation process it can be said that the newly developed SRP system can successfully adapted not only in static site on highway: parking lots or ticketing booth, but also in dynamic site on highway: driving and wheel path.
        2.
        2018.05 구독 인증기관·개인회원 무료
        In case of performing asphalt pavement overlay on existing concrete pavement layer, applying asphalt emulsion tack-coating or spreading prime-coating is considered to improve adhesion between asphalt and concrete layer. After coating work is done a curing process is considered not only for promoting evaporation process in coated (and/or spread) asphalt emulsion, but also for generating a membrane which can act as a bonding agent. Finally, asphalt overlay construction is performed when this curing process is completely done. However, during asphalt overlay construction process remarkable amount of spread tack-coating layer is lost due to asphalt material transfer vehicles (e.g. trucks, approximately 40~50% of total spread tack coating material is lost). In this paper, a new pavement equipment contains simultaneous asphalt emulsion spreading ability and corresponding construction techniques are introduced. Through applying this equipment, non-stop two step sequent working process: spreading asphalt emulsion on to existing concrete pavement layer then paving asphalt material for overlay construction, is available. During pavement working process temperature of asphalt material was kept with ranged between 130ºC and 170ºC. After performing field performance evaluation, it was found that crucial improvement in pavement layer adhesion, crack and rutting resistant ability were observed compared to the conventional paving method.