검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        1.
        2022.10 구독 인증기관·개인회원 무료
        The decommissioning process of Kori Nuclear Power Plant No.1, which was permanently suspended in 2017, various studies and attention on the decommissioning of nuclear power plants and waste management are being focused. In particular, decommissioning of high-risk facilities should take into account both safety and economic aspects. Small defects in the decommissioning process may lead to major disasters, and the resulting economic losses will cause enormous damage at the national level. In order to prevent such damage, various decommissioning process simulations within a virtual environment should be performed, and process errors and results should be collected and analyzed through simulation to derive the optimal decommissioning scenario as possible. The platform introduced in this paper builds a virtual environment based on drawing and modeling data of Kori Nuclear Power Plant No.1 and automatically creates an optimized cutting path for dismantling the facility and internal structure, and simulates a cutting process similar to reality using Robot Arm. In addition, it is possible to derive and analyze a cutting process scenario by processing process results such as time required for work and cutting distance collected through simulation.