In contemporary global warfare, the significance and imperative of air transportation have been steadily growing. The Republic of Korea Air Force currently operates only light and medium-sized military cargo planes, but does not have a heavy one. The current air transportation capability is limited to meet various present and future air transport needs due to lack of performance such as payload, range, cruise speed and altitude. The problem of population cliffs and lack of airplane parking space must also be addressed. These problems can be solved through the introduction of heavy cargo planes. Until now, most studies on the need of heavy cargo plane and increasing air transport capability have focused on the necessity. Some of them suggested specific quantity and model but have not provided scientific evidence. In this study, the appropriate ratio of heavy cargo plane suitable for the Korea's national power was calculated using principal component analysis and cluster analysis. In addition, an optimization model was established to maximize air transport capability considering realistic constraints. Finally we analyze the results of optimization model and compare two alternatives for force structure.
In this paper, we introduce a pilot's scheduling model which is able to maintain and balance their capabilities for each relevant skill level in military helicopter squadron. Flight scheduler has to consider many factors related pilot's flight information and spends a lot of times and efforts for flight planning without scientific process depending on his/her own capability and experience. This model reflected overall characteristics that include pilot's progression by basis monthly and cumulative flight hours, operational recent flight data and quickly find out a pinpoint areas of concern with respect to their mission subjects etc. There also include essential several constraints, such as personnel qualifications, and Army helicopter training policy’s constraints such as regulations and guidelines. We presented binary Integer Programming (IP) mathematical formulation for optimization and demonstrated its effectiveness by comparisons of real schedule versus model's solution to several cases experimental scenarios and greedy random simulation model. The model made the schedule in less than 30 minutes, including the data preprocessing process, and the results of the allocation were more equal than the actual one. This makes it possible to reduce the workload of the scheduler and effectively manages the pilot's skills. We expect to set up and improve better flight planning and combat readiness in Korea Army aviation.
It is very crucial activities that Korean army have to detect and recognize enemy’s locations and types of weapon of their artillery firstly for effective operation of friendly force’s artillery weapons during wartime. For these activities, one of the most critical artillery weapon systems is the anti-artillery radar (hereafter; radars) for immediate counter-fire operations against the target. So, in early wartime these radar’s roles are very important for minimizing friendly force’s damage because arbiters have to recognize a several enemy’s artillery positions quickly and then to take an action right away. Up to date, Republic of Korea Army for tactical artillery operations only depends on individual commander’s intuition and capability. Therefore, we propose these radars allocation model based on integer programming that combines ArcGIS (Geographic Information System) analysis data and each radar’s performances which include allowable specific ranges of altitude, azimuth (FOV; field of view) and distances for target detection, and weapons types i.e., rocket, mortars and cannon ammo etc. And we demonstrate the effectiveness of their allocation’s solution of available various types of radar asset through several experimental scenarios. The proposed model can be ensured the optimal detection coverage, the enhancement of artillery radar’s operations and assisting a quick decision for commander finally.
Artillery fire power due to effectiveness which is hard to predict well-planned and surprising attack can give a fear and shock to the personnel and is a very core weapon system and takes a critical role in wartime. Therefore in order to maximize operational effectiveness, Army required protecting artillery and takes a quick attack action through rapid construction of artillery’s positions. The artillery use artillery’s position to prevent exposure by moving to other position frequently. They have to move and construct at new artillery’s positions quickly against exposing existed place by foe’s recognition. These positions should be built by not manpower but engineering construction equipment. Because artillery positions have to protect human and artillery equipment well and build quickly. Military engineering battalion have lots of construction equipment which include excavator, loader, dozer, combat multi-purposed excavator, armored combat earthmover dump truck and so on. So they have to decide to optimal number of Team combining these equipments and determine construction sequence of artillery’s position in operational plan. In this research, we propose to decide number of Team efficiently and allocate required construction’s positions for each Team under constraints of limited equipments and time. To do so, we develop efficient heuristic method which can give near optimal solution and be applied to various situation including commander’s intention, artillery position’s priority or grouping etc. This heuristic can support quick and flexible construction plan of artillery positions not only for using various composition’s equipment to organize Teams but also for changing quantity of positions.