검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 193

        183.
        2009.09 KCI 등재 서비스 종료(열람 제한)
        The purpose of this study is to analyze the present condition of the landscape plans(LPs) established in the Rural Village Development Projects(RVDPs) and to propose the ways to improve the LP. Toward this end, the legal system related to rural landscape and the RVDP were examined. Also, the current condition of the LPs was diagnosed through making researches on the RVDP and LP of the 10 regions. The results of examining the legal system showed that the suitable types of the LPs is 'the Specific Landscape Plan' in Rural Area. Of the development projects that have been in operation, RVDP was found to have been equipped with the system. Because the LPs can be established and the contents of formation and readjustment of rural landscape elements were broadly dealt with in RVDP. And the RVDPs consisted mostly of scenery facilities, rural village sightseeing, and income-growth. The results of examining the plan establishment procedures showed that the LPs were set up as subordinate plans of the RVDP, so structural problems such as the positions of the plans, inadequacy in the procedures of approval and collecting opinions were identified. Such problems were pointed out as the cause of the LP to deal with the contents of the basic designs of the RVDP. The schemes to resolve the problems are to give equal positions to the LPs and to the basic plans of the RVDP. When the results of this study are reflected on the policies, the LP will effectively carry out the functions of formation and management of continued scenery preservation of rural villages.
        185.
        2008.12 KCI 등재 서비스 종료(열람 제한)
        The purpose of this study is to identify the trend of the contents of the plan that was implemented through contents analysis on the master plan project of rural village development projects that began in 2004. Contents analysis is based on the classification of business in the detailed enforcement regulations of rural village development project. Analysis on the project contents was conducted for 30 days from June 20 to July 20 for the 132 regions established in the master plan during the period from 2004 to 2007. The results of the analysis showed the following. First, scenery facilities, rural tourism, cultural welfare and income basis projects accounted for 76.5% of the total projects. Second, with regard to investment costs depending on the contents of the projects, cultural welfare, rural tourism and income basis projects accounted for 66.3% of the total investment costs. Third, it was found out that, with regard to the trend of change in the project contents by year, income basis projects were sharply reduced whereas cultural welfare and scenery facilities projects were increased. Finally, with regard to the analysis on the projects by region, it was found that Gangwon, Gyeonggi and Chungnam gave high weight on rural tourism, whereas Gyeongbuk, Jeonnam and Jeonbuk gave low weight on rural tourism. Particularly, Gyeongnam was found to have given low weight on income basis project.
        186.
        2008.10 KCI 등재 서비스 종료(열람 제한)
        본 연구의 목적은 전라남도 해양수산 분야의 정책 사업들에 대한 기반기술을 호남지역 Sea Grant 사업단(이하 호남 SG)에서 확보하기 위한 연구개발 전략방안을 수립하는데 있다. 호남 SG의 목적은 과학적인 기반을 토대로 연구와 대민활동 및 교육을 전개하여 지속 가능한 호남지역 연안자원의 보존과 발전을 도모함에 있다. 전략수립을 위하여 우선, 80건의 전라남도 정책 자료와, 40건의 호남 SG 연구 자료를 입수한 후, 다섯 가지 해양수산 분야로 분류하였다. 그리고 각 분야별 자료에서 핵심단어를 발췌한 후, 핵심단어에 내포된 의미를 '실용위주', '이론위주', '미래지향', '현재지향' 등 네 가지 척도를 갖는 4분법적 의미 분할 방법을 적용하여 평가하였다. 그리고 평가결과를 기반으로 전략방안을 제안하고, 제안한 전략방안의 현장적용에 관해서 검토하였다.
        187.
        2007.10 KCI 등재 서비스 종료(열람 제한)
        본 연구에서는 과학기술부의 21C 프론티어 사업 중 하나인 수자원의 지속적 확보기술개발사업단에서 연구 개발 중인 수자원 확보기술을 대상으로 기술평가 모형을 구축하였다. 이는 개발기술의 가치평가를 통하여 R&D가 효율적으로 사용되고 개발된 기술이 실용화 단계까지 성공적으로 갈 수 있도록 기여함에 있다. 수자원 확보기술의 성격을 반영할 수 있도록 정량적 평가뿐만 아니라 정성적 평가가 모두 가능한 2개의 계층으로 이루어진 평가틀이 구축되었다. 4개의 평가기준
        188.
        2007.07 KCI 등재 서비스 종료(열람 제한)
        In Korean coastal areas, land reclamations are main development projects that should be based on environmental impact assessment(EIA), because those human interventions can change coastlines, damage tidal flats, and pollute adjacent areas to threat seafood safety and devaluate overall ecosystem service value. Existing procedures of the EIA for land reclamation projects were diagnosed and evaluated to enhance them. Problems were identified in the designation of survey areas, the consistency in survey sites and periods, the standardization of survey methods and reports, the confidence of survey results and the verification of predictions. Lack of integration was noticeable and could be improved by synthesizing different assessments from topography․geography, marine physics, marine chemistry and marine biology. We suggest that successful precautionary marine environment management requires readjusting the cost of EIA, recruiting experts in marine environment, constructing database and establishing specialized assessment system.
        189.
        2007.06 KCI 등재 서비스 종료(열람 제한)
        MOCIE(Ministry of Commerce, Industry and Energy) handles 6 Projects for Intelligent Robot, whose budget is around 40 Million dollars per year. In this paper we have tried to analyze the state of robot technology of the projects. Each sub-projects has been divided according to the technological classification. Two major projects of Next Generation Growth Engine and 21C Frontier show different state each other. The former is focused on the product while the latter on the technology. Output of 21C Frontier should be linked to the Next Generation Growth Engine, otherwise, it will fail to advance. The project management handles only the quantitative performance such as business results, number of prototype, and number of patents and papers. Technological Capability is essential and it should be managed. This paper proposes efficient classification of robot technology and technology index.
        190.
        2006.12 KCI 등재 서비스 종료(열람 제한)
        공공사업이나 공공의 목적으로 제공되는 재화의 경험적 평가에 있어 다기준의사결정기법은 광범위한 평가기준을 고려할 수 있기 때문에 의사결정권자에게 적절한 의사결정 도구를 제공하였다. 대립관계문제의 의사결정 방법으로 다기준의사결정기법은 도로, 댐 및 항만건설 등 공공사업 분야에서 이의 유용성을 입증하였다. 본 연구에서는 다기준의사결정기법의 장점을 활용하기 위하여 사회, 경제, 환경 및 사업실현성 측면에서 댐 사업 평가지표를 수자원의 지속가능성에 바탕을 두고
        191.
        2003.11 KCI 등재 서비스 종료(열람 제한)
        The objectives of the study are to improve techniques for social impact assessment and to suggest their measuring methods to apply in small scale rural development projects. Population, residence, industries, and traffic volumes were selected to measure the social and economic impact assessment of Seongeup agricultural water development project in Jeju Province. Existing data gathering methods were used to estimate the changes of population and traffic volumes. Interview schedule for villagers was applied to estimate the residents' satisfaction to living environments. Interview schedule for experts was applied to estimate agricultural productivity and land price. The results of social and economic impact assessment show that there will be considerable changes in living environments, agricultural productivity, and land price. On the contrary, the project will make little impacts on the changes of population, em-ployment, and traffic volumes.
        193.
        1999.02 KCI 등재 서비스 종료(열람 제한)
        The study intends to find out contents and impacts of rural development projects implemented by government in Ucheon myon-center village (Hoingseong-county) between 1989-1995. The projects in concern are Rural Industrial Estate Project(1989-90) and Rural Collective Village Project(1992-93), The restructuring of village plan introduced new construction and renewal of buildings that are required for a myon-center in general has to be. The study reveals some morphological patterns the village has and needs to be adjusted. As a conclusion, it proposes a conception of self-containment for a myon-center development. It is necessary that a project plan strategy should be based upon harmonious exploitation between old and new, flexible planning, and sense of technological alternatives.
        6 7 8 9 10