In this study, the risk matrix method was applied to reduce the number of post-tension survey in maintenance. The risk matrix weights and evaluation indexes were studied according to the maintenance system.
In this study, the risk matrix method was applied to reduce the number of post-tension survey in maintenance. The risk matrix weights and evaluation indexes were studied according to the maintenance system.