Recently, the slope failure, which is frequently happened in Ice-melting season, attracts attention in South Korea. The increasing trend in frequency of freezing-thawing process has regarded as major reason of slope failure. However, the time and check level are not reflected at the safety assessments and inspection guidelines. Therefore, the characteristics of slope in ice-melting season should be considered to improve the slope stability in ice-melting season. The purpose of this study is to evaluate the influence of the potential risk factors on the slope stability for development of the slope checklist reflecting the timing and check level based on the slope inspection checklist which is provided by the recent research.