검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2017.09 서비스 종료(열람 제한)
        The precast modular bridge that combines pre-designed standard modules was constructed by KICT. A field test was performed to estimate the structural performance of this bridge. As a result, this bridge has sufficient safety and serviceability as a highway bridge.
        2.
        2013.10 서비스 종료(열람 제한)
        The first ultra-high performance concrete (UHPC) road bridge in Korea was constructed by KICT in 2012. Field loading tests were performed to estimate the structural performance of this bridge. As a result, we found that this bridge has sufficient safety and serviceability.