검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2022.05 구독 인증기관·개인회원 무료
        The purpose of full system decontamination before decommissioning a nuclear power plant is to reduce radiation exposure of decommissioning workers and to reduce decommissioning waste. In general, full system decontamination removes the CRUD nuclides deposited on the inner surface of the reactor coolant system, chemical and volume control system, residual heat removal system, pressurizer, steam generator tube, etc. by chemical decontamination method. The full system decontamination process applied to Maine Yankee and Connecticut Yankee in the USA, Stade, Obrigheim, Unterweser, Nekawestheim Unit 1 in Germany, Mihama Unit 1 and 2 in Japan, Jose Cabrera Unit 1 in Spain, and Barseback Unit 1 and 2 in Sweden are HP/CORD UV, NP/CORD UV, and DfD. In this study, the quantity of 60Co radioactivity removal, metal removal, ion exchange resin and filter generation according to reactor power, surface area and volume of the full system decontamination flow path, and the decontamination process were compared and analyzed. In addition, the quantity of 60Co radioactivity removal by each nuclear power plant was compared and analyzed with the evaluation results of the 60CO radioactivity inventory of the Kori Unit 1 full system decontamination loops conducted by SAE-AN Enertech Corporation.