검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2018.05 구독 인증기관·개인회원 무료
        Composite pavements are constructed by placing a high functional asphalt surface layer on a high performance concrete rigid base layer and provide a more durable, high functional surface to road users. Service life of composite pavements is dependent on the bonding performance of the lower rigid base and the flexible surface layer. Accordingly, it is necessary to place an impermeability layer between the functional surface layer and the rigid base to enhance bonding performance and to prevent moisture penetration into the rigid base and deterioration of pavement. In order to use optimal composite pavement sections, two types were applied to impermeability layer: highly impermeable water-tight SMA and mastic asphalt currently in use. APT (Accelerated Pavement Testing) and experimental construction were carried out to evaluate bond strengths between the rigid base and the impermeability layer depending on the type of impermeability layers. Composite pavement sections for the APT had a 22 cm concrete rigid base layer and a 5cm functional surface, as well as either 5cm of SMA impermeability layer and 5cm of mastic layer. After applying around 8,574,000 ESALs, pull-off test was conducted, which showed that the mastic section outperformed the SMA section. In the experimental construction, three types of rigid base layers, JCP (Jointed Concrete Pavement), CRCP (Continuously Reinforced Concrete Pavement), and RCCP (Roller Compacted Concrete Pavement), were used for composite pavement sections, and as in the APT, two types of impermeability layers, SMA and mastic, were used per rigid base layer of new and deteriorated concrete pavement. Therefore, seven composite pavement sections in total were constructed. We measured the bond strength over one year or so following the construction of these composite pavement sections and found that regardless of the type of rigid base layer and whether it was new or not, those sections with a mastic impermeability layer had high bond strengths.