검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 5

        2.
        2014.10 서비스 종료(열람 제한)
        Risk Based Inspection(RBI) Period was proposed for highway bridges in Korea. Hazard factors affecting bridge condition deterioration were found by analyzing condition data from Highway Bridge Management System(HBMS). Certain level of correlations between those factors and condition deterioration were found. They are used to evaluate hazard score. Summarizing several hazard factors, final hazard is classified as three level;high, moderate, low. Vulnerability is assessed only by the current state of bridge. Then, risk matrix is suggested for inspection periods. Inspection periods of the bridges with grade C, D, and E are maintained the same as before. But, those of grade A and B with moderate and high hazard score are elongated to maximum 6 years while the maximum inspection period is three years at present. By adjusting inspection period according to risk assessment, it was shown that 27% of average inspection manpower can be saved.
        3.
        2014.10 서비스 종료(열람 제한)
        Risk Based Inspection(RBI) Period was proposed for highway bridges in Korea. Hazard factors affecting bridge condition deterioration were found by analyzing condition data from Highway Bridge Management System(HBMS). Certain level of correlations between those factors and condition deterioration were found. They are used to evaluate hazard score. Summarizing several hazard factors, final hazard is classified as three level;high, moderate, low. Vulnerability is assessed only by the current state of bridge. Then, risk matrix is suggested for inspection periods. Inspection periods of the bridges with grade C, D, and E are maintained the same as before. But, those of grade A and B with moderate and high hazard score are elongated to maximum 6 years while the maximum inspection period is three years at present. By adjusting inspection period according to risk assessment, it was shown that 27% of average inspection manpower can be saved.
        5.
        2008.09 KCI 등재 서비스 종료(열람 제한)
        본 연구는 사장교의 조망결정요소별 최적 조망점을 선정하기 위하여 교량의 3D Simulation을 제작하고 실험조건에 따라 선호도를 측정하는 방식으로 진행되었다. 이를 통해 교량의 조망결정요소에 따른 경관평가 기준을 제시하였으며, 최적 조망조건을 제시하였다. 본 연구의 주요결과를 요약하면 다음과 같다. 조망조건별 변화인식범위선정을 통해 시점이동에 의해 사장교의 변화를 인식할 수 있는 최소범위를 측정하였다. 그 결과 수평각은 5°, 시선입사각은 4°, 시점높이는 교량전체 높이의 10%로 변화시켰을 경우 사장교의 변화를 인식하는 것으로 나타났다. 사장교와 가장 잘 어울리는 주변경관을 선정하기 위한 선호도 분석결과 도시경관유형이 가장 높은 선호도를 보이는 것으로 나타났다. 조망결정요소별 최적의 조망조건 선정결과 수평각에 경우 55°일 때 가장 높은 선호도를 보였으며, 시선입사각에 경우 20°일 때 가장 높은 선호도를 보였으며, 시점높이의 경우 8/10H일 때 가장 높은 선호도를 보였다. 교량의 조망조건에 따른 경관미의 고려는 교량경관계획 시 필수적인 요소임에도 불구하고 아직까지는 교량의 조망에 따른 경관미보다 형태미에 치우친 교량경관계획이 이루어지고 있는 실정이다. 따라서 본연구의 수행을 통하여 교량경관계획 시 조망의 중요성을 재평가하고, 조망조건에 따른 교량평가의 기준을 제시함으로써 향후 체계적인 교량경관계획의 기초자료를 제시할 수 있을 것으로 판단된다.