검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4

        1.
        2019.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        The objective of this numerical study is to investigate the effect of shaft part’s diameter on the load distribution, under-fill, and metal-flow line characteristics in tubular & solid shaft yoke of Al-IMS. The outer diameter of tubular shaft yoke was changed from 30mm to 35mm, and the shaft diameter of solid shaft yoke was varied from 20mm to 25mm. In this results, the required load for production was linearly increased with increasing the tubular shaft yoke outer diameter. In the solid shaft yoke, the loads for the shaft part extending process were almost constant by 10,000kg, however, the loads for generating the yoke process, which were needed a lot of strain, were increased by 4,000kg with increasing the diameter of shaft part. The under-fill regions according to diameter of the shaft part were not observed in both products, and the metal-flow lines were also straight without folding phenomena.
        4,000원
        2.
        2018.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        본 연구의 목적은 전국에 분포하는 일본잎갈나무 임분에 대해 산림시업 수행이 직경분포변화에 미치 는 영향에 대해 분석하였다. 본 연구에 사용한 자료는 국가산림자원조사 중 시업지 232plots, 비시업지 47plots의 고정표본점 자료를 활용하였다. 직경분포모델은 Weibull 누적분포함수를 사용하였으며, 분석 방법에는 백분위(Percentile)에 근거한 직경모형추정, 백분위(Percentile)에 대한 모수복구 방법을 사용 하였다. 개발한 모델을 이용하여 산림시업의 수행여부에 따른 시나리오(임령, 지위지수, 임분밀도) 별 임분생장량을 예측한 결과, 시업지 임분의 최대임목본수를 차지하는 평균 흉고직경의 이동이 비시업지 임분에 비해 이동량과 생장량이 더 높게 나타났으며, 대경목이 차지하는 비율 또한 시업지 임분이 높게 예측되었다. 본 연구의 결과는 직경급에 따른 목재생산량의 장기적인 예측과 동적인 임분구조 해석에 기초적인 정보를 제공할 수 있을 것으로 사료되어진다.
        4,200원
        3.
        2022.01 KCI 등재 서비스 종료(열람 제한)
        The objective of this study is to determine the appropriate size of the inlet pipe diameter and thereby conduct hydraulic analysis for the Korean water distribution network. To this end, the data tables for equivalent pipe diameters and outflow rates presently employed in Korea were adopted. By incorporating the table of equivalent pipe diameters, it was found that the size of the inlet pipe diameter was overestimated, which can cause shortage of water pressure and malfunctioning or insufficiency of outflow rate in the corresponding adjacent region. However, by conducting hydraulic analysis based on the table of outflow rates, relatively reasonable flow rates were observed. Furthermore, by comparing the real demand-driven analysis (RDDA) approach and demand-driven analysis (DDA) approach toward managing the huge water demand, it was observed that DDA could not effectively respond to real hourly usage conditions, whereas RDDA (which reflects the hourly effects of inlet pipe diameter and storage tanks) demonstrated results similar to that of real water supply.
        4.
        1998.06 KCI 등재 서비스 종료(열람 제한)
        상수관망은 상수공급시스템에서 핵심적인 부분이다. 주어진 상수공급시스템에서 배수관망에 대한 비용은 사업전체 비용에 대한 대부분을 차지하고 있다. 관망에 대한 설계과정 중에서 최적화기법을 사용하여 비용을 절감하기 위한 연구가 시도되었다. 주어진 상수관망 시스템의 설계시 고려되는 관경의 결정을 위해 유량해석과 최적화 기법이 연계되어 해석하는 반복기법이 적용되었다. 유량해석을 위해서 선형화기법이 되입되었고 관경의 최적화를 위해서 선형계획법에 기초한 개정 단체법