In order to decide the location of appropriate onshore wind farm with higher potential wind energy, several decision processes using Geographic Information System (GIS) including Digital Elevation Map (DEM) were proposed and we also estimated the wind resources through the proposed decision process. Decision process consists with three steps.
First step is excluding inappropriate location geographically using DEM data including SRTM (Shuttle Radar Topography Mission) terrain data, landslide, land-use, roadway, and forest road data. And the second step of decision process is consideration of the difficulty caused by the natural environmental problem. This step is carried out using ECVAM (Environmental Conservation Value Assessment Map) data. And final step is determination of the most suitable location through the Moving Suitability Identification Method (MSIM) based on the moving potentially estimated wind resources area. Proposed decision process was applied over the Korean Peninsula.
Wind resource potential estimated by the first and the second step is cases shows 35.09 GW and 7.17 GW, respectively, and the total evaluated energy from the all proposed step were 0.43 GW and 1.87 GW for the 3 ㎞and 1.5 ㎞geographical grid size, respectively.