검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2022.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In the case of a die-casting process, defects that are difficult to confirm by visual inspection, such as shrinkage bubbles, may occur due to an error in maintaining a vacuum state. Since these casting defects are discovered during post-processing operations such as heat treatment or finishing work, they cannot be taken in advance at the casting time, which can cause a large number of defects. In this study, we propose an approach that can predict the occurrence of casting defects by defect type using machine learning technology based on casting parameter data collected from equipment in the die casting process in real time. Die-casting parameter data can basically be collected through the casting equipment controller. In order to perform classification analysis for predicting defects by defect type, labeling of casting parameters must be performed. In this study, first, the defective data set is separated by performing the primary clustering based on the total defect rate obtained during the post-processing. Second, the secondary cluster analysis is performed using the defect rate by type for the separated defect data set, and the labeling task is performed by defect type using the cluster analysis result. Finally, a classification learning model is created by collecting the entire labeled data set, and a real-time monitoring system for defect prediction using LabView and Python was implemented. When a defect is predicted, notification is performed so that the operator can cope with it, such as displaying on the monitoring screen and alarm notification.
        4,000원
        2.
        2003.10 구독 인증기관 무료, 개인회원 유료
        TOC(Theory Of Constraints) has been applied to manufacturing field traditionally. Nowadays, it's area is being wide to SCM, Service, Marketing. This paper analyzed Demand pull Manufacturing system, then, tried to apply TOC concept for improving productivity. It used DBR (Drum-Buffer-Rope) considering defect and OEE (Overall Equipment Efficiency) . For illustration, simulation was showed and it is suggested how to do for productivity improvement.
        4,000원