On March 11 2011, Fukushima Daiichi nuclear power plant site was attacked by a huge tsunami caused by Tohoku Pacific Ocean earthquake. Nuclear fuels of unit 1, 2, and 3 of Fukushima Daiichi nuclear power plant was melted down by the disaster. After the accident, Japan’s government has announced “Mid-and-Long-Term Roadmap towards the decommissioning of TEPCO’s Fukushima Daiichi Nuclear Power Station Units 1-4”. The topics of roadmap is made of measures to deal with contaminated water, removal of fuel rod assemblies from spent fuel pools, retrieval of fuel debris, measures to deal with waste materials, and other operations. To support the activity of the roadmap, various facilities about decommissioning have been established and operated on inside or outside of Fukushima Daiichi nuclear power plant site. Representatively, Collaborative Laboratories for Advanced Decommissioning Science which conducts R&D decommissioning, Naraha Remote Technology Development Center which develops remotes robots and VR (Virtual reality), Okuma Analysis and Research Center which performs radiochemical analyses for radioactive waste, and Fukushima Environmental Safety Center which conducts environmental dynamics and radiation monitoring.
Japan’s government has announced plan to release the contaminated water stored from the tanks of the Fukushima Daiichi nuclear power plant site into the sea in June. The contaminated water is treated by SARRY (Cesium removal facility) and ALPS (advanced liquid processing system) to remove 62 radionuclide containing Cesium, Strontium, Iodine, and so on using filtration, precipitation (or coprecipitation) and adsorption for other nuclides (except for H-3 and C-14). The total amount of the contaminated water stored at tanks is 1,328,508 m3 (as of March 23, 2023). Currently, three ALPS systems which are existing ALPS, improved ALPS, high performance ALPS have been operated to meet the regulatory standard for release to the sea. According to the release plan, they have announced that 30 nuclides and H-3 concentration of the contaminated water will be measured and assessed before/after the discharge of the contaminated water into the sea. Before the release, the contaminated water is re-treated by reverse osmosis membrane facility and additional ALPS. And then, the water will be diluted with seawater more than 100 times. The diluted water will then move through an undersea tunnel and be released about 1 kilometer off the coast.
From Fukushima nuclear disaster, as the water which is supplied by rain and groundwater flow into reactor building, contaminated water which contains radioactive nuclides is occurred. Although about 600 tons of contaminated water was generated at the early of accident, as the groundwater management system is developing, about 150 tons of contaminated water is generated now. Tokyo Electric Power Holdings (TEPCO) operate a multi-nuclide removal equipment which is called ‘ALPS’ and store purified water (ALPS treated water) in the Fukushima NPP site by tank. From 2023, the Japanese government decided to dilute the stored ALPS treated water and discharge it into the ocean to secure space on the site. In this study, based on the data opened to the public by TEPCO, the current status of ALPS is investigated. The dilution and discharge process under conceptual design was investigated. In addition, the treatment capacity of ALPS was analyzed based on the radioactivity concentration data of 7 nuclides. And then, two points to be checked found. First, it was confirmed that the performance of ALPS temporarily decreased between 2015 and 2018 due to reduced replacement cycle of filter and absorbent. Second, it was confirmed that the ALPS treated water from specific ALPS still haven’t satisfied the discharge limit for I-129, Sr-90, and Cs-137. In the case of Cs-137, about 1.7 times the radioactivity concentration was detected compared to the discharge limit. For I-129 and Sr-90, about 2.4 times and 2.1 times of radioactivity concentration was detected compared to the discharge limit. From this study, some of the ALPS treated water are confirmed that the radioactivity concentration exceeds the discharge limit, and the treatment capacity of ALPS might be unstable depend on the ALPS operation such as replacement cycle. Therefore, before the discharging of contaminated water on 2023, it is necessary to inspect ALPS if it purifies contaminated water with reliability or not, and to secure the reliable evaluation method to measure radioactivity concentration.
Recently, Japan’s government has announced Tokyo Electric Power Company’s plan to discharge contaminated water stored from the tanks of the Fukushima Daiichi nuclear power plant site into the sea. The contaminated water is treated by advanced liquid processing system (ALPS) to remove 62 radionuclide containing cesium, strontium, iodine and etc. using co-precipitation (or precipitation) and adsorption for other nuclides (except for tritium and carbon-14). The total amount of the contaminated water generated by ALPS facility is 1,311,736 m3 (as of August 18, 2022). The amount of contaminated water is estimated same as Tokyo dome volume. Under the sea discharge plan, the contaminated water will be diluted in seawater more than 100 times, and tritium concentration lowered 1/7 of the drinking water standard set by the World Health Organization (10,000 Bq/liters). The diluted water will then move through an undersea tunnel and be discharged about 1 kilometer off the coast.
The Fukushima nuclear power plant accident, which was caused by the Great East Japan Earthquake on March 11, 2011, is of great concern to the Korean people. The scope of interest is wide and diverse, from the nuclear accident itself and the damage situation, to the current situation in Fukushima Prefecture and Japan, and to the safety of Japanese agricultural and fishery products. Concerns about nuclear safety following the Fukushima nuclear accident have a significant impact on neighboring nation’s energy policy. It has been 11 years since the Fukushima nuclear accident. In neighboring nation society, the nature and extent of damage caused by the Fukushima nuclear accident, the feasibility of follow-up measures at home and abroad, the impact on neighboring nations, and the direction of nuclear policy reflecting the lessons of the accident are hotly debated topics. Recently, the controversy has grown further as it is intertwined with Japan’s concerns about the safety and discharge of the contaminated water into the sea, and conflicts over domestic nuclear power policies. About 1.29 million tons, as of March 24, 2022, of the contaminated water are generated, which is close to the 1.37 million tons of water storage capacity. In response, the Japanese government announced on April 13, 2021, that it plans to discharge the contaminated water into the sea from 2023. This study evaluates the amount of the contaminated water that has passed through the ALPS and reviews the preparations and related facilities for ocean discharge after diluting the contaminated water. In addition, it is intended to forecast the various impacts of ocean discharge.