검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2020.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        When a radial collector well is installed and operated for agricultural purposes, negative impacts may be observed over time due to the clogging of horizontal arms, such as reduced groundwater discharge and water quality deterioration. When radial collector well No. 2 was rehabilitated using the high-pressure impulse generation technique, the specific capacity and transmissivity were increased by 43.1 and 100.6%, respectively. In contrast, according to air surging, the specific capacity and transmissivity increased by 33.8 and 85.8%, respectively, compared to the initial rate before rehabilitation. During the operation of radial collector wells since construction, the time of well rehabilitation can be effectively determined by continuously monitoring the groundwater level and pumping rate of the radial collector wells, thereby preventing a decrease in productivity.
        4,000원
        2.
        2015.02 서비스 종료(열람 제한)
        지반구조물의 동적특성은 미소변형률 수준에서의 변형계수나 이를 결정하기 위한 전단파속도나 압축파속도와 같은 물리적 의미의 체적파속도로 대표되며, 지진과 같은 동적 조건뿐만 아니라 공용상태의 정적 조건의 상태 또는 안정성 평가 과정에서의 중요한 변수이다. 특히, 이러한 체적파속도는 대상 지반 또는 지반구조물에서의 시추공 탄성파시험 수행을 통해 보다 신뢰성 높게 획득할 수 있다. 본 연구에서는 필댐 안정성 평가의 정량적 지표인 댐체 및 기초부의 동적 특성을 결정하기 위한 기법으로 현장 다운홀 탄성파 시험을 수행하고자 하였다. 댐 대상의 다운홀 시험은 추가적인 시추를 통해 시험공을 형성하여 실시하고, 일반적으로 시험 종류 후 시험공을 폐공한다. 이에 기존 댐 대상의 다운홀 시험 과정에 비해 경제적일 뿐만 아니라 댐에 대한 지속적이고 정기적인 동적 특성 평가가 가능한 기법으로서, 지하수위 관측공에 적합한 수진기를 활용한 다운홀 시험을 중심코어형 사력댐을 대상으로 실시하여 댐체와 기초 지반의 전단파속도를 평가하였다. 현장에서의 다운홀 시험은 지하수위 관측공의 초기 설치시 관측공과 지반의 접촉 불량 및 유지 관리 부실로 인해 일부 지하수위 관측공에서는 시험이 성공하지 못하였지만, 관측공 상태가 양호한 경우 깊이별 전단파속도 분포를 용이하게 결정할 수 있었다. 따라서 지하수위 관측공의 설치 및 유지 관리가 적절할 경우 다운홀 탄성파시험을 통해 필댐에 대한 지속적인 동적 특성 결정이 가능하고, 이로부터 중장기적인 안정성 평가와 관련 대책을 수립할 수 있을 것으로 판단된다.