검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 3

        1.
        2015.12 KCI 등재 서비스 종료(열람 제한)
        The aim of this study is to establish resident-participative primary design of integrated rural development project with master planner by setting principals of open competition and transparent decision-making about village-to-village or business-to-business unit enterprise in Onui area, Hong-seong Gun. For effective processing, software projects such as residents education and rural landscape planning are simultaneously conducted for enhancing project understanding and comprehensive development plan including related post project. Above all, competition teams for individual project were organized to establish the resident-participative primary design using survey tables of residents demand. In 6 months resident-participative processing of primary design, continuous education and visiting to advanced area are conducted in team unit. Strengthened ability of team unit can be used in management and maintenance after project development. To do this, residents with the same opinions gathered as one competition team and identified business plans such as village asset, business location, size, program, and method for land securing. Favorable decision-making process by residents who are audience in project presentation of competition team has conducted. After selecting competition teams, continuos consulting are operated for establishing operation and management for developed or remodeled facilities through repetitive education and visiting advanced area. In this process, unit project suggested by competition team are completed. Preliminary selection was conducted by experts who were entrusted by residents. After residents agreement of project main stream such as major facilities and location, final detailed cost of projects are work out. Suggested process in this study which choose the final project by residents would improve residents' voluntary participation in integrated rural development project through open competition in establishing primary design.
        2.
        2007.06 KCI 등재 서비스 종료(열람 제한)
        In this study, We developed an evaluation system for the interim check of Integrated Rural Village Development Project and analyzed its applicability to an actual evaluation process through a pilot evaluation on regions selected. The evaluation system consists of documentary assessments(30%) and field inspections(70%). The documentary assessments are quantitative assessments on check-lists reports by self-evaluation prepared by local governments. The field inspections are qualitative assessments by evaluation teams. Sixteen evaluation indices were developed for documentary assessments and seven criteria were designed for field inspections. For a pilot evaluation, one region in each province excluding Jeju Do, eight regions was selected and the field inspections due to circumstances was proceeded in two regions. The results of documentary assessments indicate that most of regions are evaluated low in project performance attributable to the delay in security for sites. In the field inspections, it appears that most of the regions evaluated high at the documentary assessments got a high point from them. They also show that coordination of action plans, rather than quantitative achievements, is a base determining success of the projects.
        3.
        2006.06 KCI 등재 서비스 종료(열람 제한)
        This study attempts to develop an interim evaluation system for the Integrated Rural Village Cluster Development Project(IRVCDP) which can secure its identity and sustainability, and induce its early settlement, and to derive plans for its steady progress. The evaluation system consists of three levels. The highest-order level is evaluation purposes, which describe IRVCDP's goals. They are expansion of income bases(EIB), improvement of living environments(ILE), strengthening of regional capabilities(SRC) and constructing effective project operation system(CEPOS). The second level is evaluation items, which each characterize the relevant evaluation purposes. The last level is evaluation indices, which observe achievement f3r evaluation purposes. 22 evaluation indices are selected to satisfy the purposes of this study through a brainstorming process and a survey on opinions of experts for those evaluation purposes and evaluation items which are derived from analyzing the IRVCDP's properties. The relative importance of the evaluation indices selected are determined through the AHP analysis. The most intriguing result from the AHP analysis is that strengthening of regional capabilities is found to be the most important one among evaluation purposes. It can be said that this result is parallel to a ultimate goal of the IRVCDP.