In this study, to identify the ineffectiveness of inter-connected system of cargo volume between the Pusan Port and inland areas and also to make more rational suggestions, the following conclusions were drawn by analyzing Container Cargo Traffic from BCTOC to Off-Dock CY: 1. There existed about 30% to 50% reduction in the container transport times when the container transport vehicles were operated during the off-peak period to alleviate the traffic congestion due to mixed traffic. 2. There appeared to be more economic when Off-Dock DY's scattered around the City of Pusan were unified in one ODCY Unit at YangSan, and the Exclusive Overpass Freeway System for the container transport vehicles were constructed and operated on the existing Urban Freeway from BCTOC ti this ODCY Unit (Expected to make about 230 billions Won in net present value by NPV method).