검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2022.06 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : The purpose of this study is to perform traffic flow characteristics analysis for each point of the long-term work zones and to propose an estimated capacity method to support the establishment of traffic flow management strategies for the long-term work zones. METHODS : The study explained the difference in traffic flow characteristics between the short-term and the long-term work zones, and estimated the capacity of the long-term work zones. The analysis data were collected from five points of long-term work zones of the twolane highway. And VDS and DSRC data were applied to validate data. RESULTS : The characteristics of traffic flow at each measurement point in the long-term work zones showed some differences, among which the capacity was estimated as the starting point to be 1,200 pcphpl and the ending point, 1,400 pcphpl. The delay length was estimated by applying the queuing theory based on the capacity of the start point where the bottleneck starts. As a result of verifying the congestion length based on space diagram map analysis, it was determined that the capacity calculation value and estimation methodology presented in this study were appropriate. CONCLUSIONS : The long-term work zones are mixed with different characteristics of roads, so as the capacity values depending on the analysis location. Therefore, it is necessary to select analysis points and methodologies for estimating capacity and delay depending on the purpose of the analysis, such as estimating the maximum queue length or analyzing the maximum travel time. Through this study, it is expected that by providing accurate information on congestion in advance, road users can detour to other roads, and construction officials can adjust the construction plan to minimize congestion in the construction section.
        4,200원