The Republic of Korea is implementing safeguards for domestic nuclear facilities through cooperation with the IAEA. But it is not to evaluate the material balance for the material unaccounted for, MUF in the bulk handling facility. Although the development of a material balance evaluation program is underway, there are no related regulations. The State Regulatory Authority, SRA is performing material balance evaluation, MBE on the facility based on the design information and material balance results of the facility. However, it is not possible to directly derive measurement uncertainty for the facility’s measurement equipment, which is an important variable of MBE. To solve this problem, it is trying to derive a method suitable for the domestic environment by investigating the some measurement uncertainty estimation methods and analyzing characteristics of them. In this study, the traditional measurement uncertainty estimation method, GUM method and GUM-S1 method were studied and the advantages and disadvantages were analyzed. Due to the problems mentioned above, the uncertainty quantification technique currently being used cannot be applied to the evaluation of the domestic material balance. Therefore, we are tying to apply them to the evaluation the domestic material balance through the above three methods or a combination of them appropriately. Through this continuing study, it is expected that it will be possible to present a plan to derive measurement uncertainty optimized for the domestic MBE environment.
Pyroprocessing is a promising technology for managing spent nuclear fuel. The nuclear material accounting of feed material is a challenging issue in safeguarding pyroprocessing facilities. The input material in pyroprocessing is in a solid-state, unlike the solution state in an input accountability tank used in conventional wet-type reprocessing. To reduce the uncertainty of the input material accounting, a double-stage homogenization process is proposed in considering the process throughput, remote controllability, and remote maintenance of an engineering-scale pyroprocessing facility. This study tests two types of mixing equipment in the proposed double-stage homogenization process using surrogate materials. The expected heterogeneity and accounting uncertainty of Pu are calculated based on the surrogate test results. The heterogeneity of Pu was 0.584% obtained from Pressurized Water Reactor (PWR) spent fuel of 59 WGd/tU when the relative standard deviation of the mass ratio, tested from the surrogate powder, is 1%. The uncertainty of the Pu accounting can be lower than 1% when the uncertainty of the spent fuel mass charged into the first mixers is 2%, and the uncertainty of the first sampling mass is 5%.