The objectives of this study is to classify evacuation types, derive the characteristics of 4 types, develop and discover evacuation routes within the performance hall space, and present the statistical classification results of the evacuation classification model by classification type. To achieve this purpose, the characteristics of each evacuation type's four types are applied through a network reliability analysis method and utilized for institutional improvement and policy. This study applies for the building law, evacuation and relief safety standards when establishing a performance hall safety management plan, and reflects it in safety-related laws, safety standards, and policy systems. Statistical data by evacuation type were analyzed, and measurement characteristics were compared and analyzed by evacuation types. Evaluate the morphological similarity and reliability of evacuation types according to door width and passage length and propose the install position of evacuation guidance sign boards. The results of this study are expected to be used as basic data to provide operation strategies for safety facility evacuation information sign boards according to evacuation route classification types when taking a safety management plan. The operation strategy for the evacuation sign boards installation that integrates employee guidance and safety training is applied to the performance hall safety management plan. It will contribute to establishing an operational strategy for performance space safety when constructing performance facilities in the future.
본 논문은 조선시대의 대표적인 중층 목구조인 공주 마곡사 대웅보전에 대하여 수직하중에 대한 구조성능을 평가하였다. 구조해석 소프트웨어인 midas Gen으로 실물과 근접하게 해석모델을 3차원으로 구축하였다. 정적해석으로 수직하중에 대한 주요 수직 및 수평 부재의 안전성과 사용성을 평가하였다. 모든 부재가 안전성과 사용성 기준을 만족하였으나, 하층 대량은 전이보 역할로 구조적 취약 점이 나타나 개선의 필요가 있다. 동적거동특성 평가를 위한 고유치해석시 주요 접합부의 상대회전강성은 5%로 가정하였다. 고유주 기는 1.105초로 비슷한 규모의 한옥 범주에 속하고 있으며, 1차 모드는 건물 전후방향의 병진운동으로 나타났다.
During the initial construction of Won buddhism, the sound absorbing material and diffusion material were used in the interior of the Won buddhism, so the sound performance at each buddhism could not be secured above a certain level, and even in the case of the Won buddhism Bukil dharma hall, the reverberation and volume of the sound generated inside the sanctum was too loud, and since the establishment of the buddhism continued to be dissatisfied, the improvement of the acoustic performance was very urgent. From this perspective, this study measured acoustic performance of the Bukil dharma hall before remodeling, determined the acoustic defects and status, and used acoustic simulation to present three plans for improving acoustic performance. Taking economic feasibility, construction, and construction duration into account, remodeling was performed on the basis of Plan 1 and post-remodeling acoustic performance was measured for comparative analysis of acoustic performance between before and after the improvement. The results of study, before and after sound performance improvement sound pressure level (SPL500Hz) was 71.9dB at 79.4dB , the weighted sound level (SPLdB(A)) was 79.7dB(A) at 89.4dB(A), reverberation time (RT500Hz) was 1.12sec at 1.49sec, early decay time (EDT500Hz) was 1.39sec at 1.63sec, definition (D50,500Hz) was 34.9% at 32.3%, clarity (C80.500Hz) was 1.0dB at –0.4dB, and RASTI was 60.0%(“Good”) at 51.3%(“Fair”) was evaluated. Therefore, the Bukil dharma hall was after remodeling, neither definition(D50) improved notably but excessive volume and reverberation and sound mixing almost disappeared and acoustic performance improved so much that many different events and services could be held.
A Catholic school is a school that spreads religious ideology to students by combining religious education with regular school curriculum. But, most Catholic schools do not have a separate liturgical space, mass is performed in multipurpose spaces such as auditoriums, and are exposed to severe acoustic defects due to the very aging facilities and lack of sound performance suitable for the liturgical space. So, in this study, an improvement plan was proposed using sound simulation after identifying acoustic defects through field measurements in the liturgical space of Haeseong High School in Jeonju. Also, hearing experiment using Acoustic Psychological Analysis was conducted to identify changes in subjective responses felt by students as they improved their acoustic performance. The results of study, before and after sound performance improvement sound pressure level(SPL500Hz) was 64.8dB at 66.7dB, the weighted sound level(SPLdB(A)) was 67.9dB(A) at 75.8dB(A), reverberation time(RT500Hz) was 2.04sec at 2.52sec, definition(D50,500Hz) was 40.2% at 33.5%, clarity(C80.500Hz) was –0.8dB at –1.18dB, and RASTI was 57.7% at 49.2% was evaluated. In addition, the amount of improvement in subjective responses before and after sound performance through psycho-acoustic experiment decreased by “Reverberation” -17.0%, “Loudness” -11.3% and increased by “Clear” 21.3%, “Vivid” 21.3%, “Intimacy” 12.4%, “Warmth” 14.3%, “Stability” 19.3%, “Godliness” 18.8%. Therefore, after improving sound performance, Haesung High School's liturgical space improved satisfaction with subjective sound performance felt by students and teachers to ensure sound performance suitable for the liturgical space.
In accordance with increase of the leisure time due to the recent economical development of the people, since the interest on the cultural performance becomes high, the construction of various performance hall is on increasing in domestic. However, in case of the multi-purpose hall constructed in domestic, because the various genres performances are performed in the one space without any special variable equipment, those of many problems have been raised that unable to satisfy the acoustic capability suitable to the purpose of performance. In case of the performance place such as the multipurpose hall, it is the requiring real situation that the variable typed system-equipped performance hall which able to adjust the acoustic characteristics suitable to each performances. Accordingly, this study has ever predicted the optimized acoustic performance through computer simulation before-opening the hall, also has ever evaluated the acoustic performance through the actual survey after-opening the hall. It is considered that such study result could be utilized as the most useful material when construction the similar multipurpose hall equipped with the variable typed system, hereafter.