검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2023.11 구독 인증기관·개인회원 무료
        Large amounts of concrete, metal, soil, and other radioactive waste are generated not only from nuclear power plants operating in Korea but also from nuclear power plant decommissioning. If it is confirmed through measurement of residual radioactivity that the concentration is below the allowable clearance level, they can be managed as general or industrial waste in accordance with the Nuclear Safety Act. The Korea Radioactive Waste Agency predicts that very low-level radioactive waste will be generated the most, at about 67.1%. If waste below clearance level among very low-level radioactive waste can be evaluated and reduced, a lot of costs can be saved. Among radioactive wastes, metal wastes in particular have various sizes, shapes, and densities. If radioactivity is measured without properly considering this, a large error occurs in the measured value even if the radioactivity value is the same. This requires a conservative measurement method using density correction taking into account the self-absorption effect. For conservative measurements, it is essential to compare measured values with calculated values using MCNP6 (Monte Carlo N-Particle). You must enter the geometry of the measurement environment and derive calculated values using F8 Tally. Clearance level of radioactive waste is determined through the above method. In addition, sufficient MDA (Minimum Detectable Activity) must be secured to determine clearance level by using NaI(Tl), plastic scintillator configuration, and lead shielding. Nuclide analysis is performed using a NaI(Tl) scintillator and the total gamma radioactivity is evaluated using a highly efficient plastic scintillator.
        2.
        2023.05 구독 인증기관·개인회원 무료
        The configuration management system was implemented on the basis of a document management system that secured stable understanding, scalability, document security, and convenience in small modular reactor. To reduce the cost and risk of errors, configuration management is implemented to maintain a balance between design requirements, physical configuration, facility configuration information. In the initial stages, configuration change review procedures was developed with the main purpose of change management such as classification system management, configuration control committee management, configuration change review preparation, configuration control committee operation, followup measures, current status and tracking management. The preparation of the configuration change review consisted of preparation, distribution approval, designation of reviewers, review, collection of review opinions, and preparation of resolution results. In the operation of the configuration control committee, it was conducted by designating review members, reviewing members, collecting operation, and approval them. The next step is to supplement and develop the requirements of IEEE Std 828-2012, such as configuration management planning, configuration management control, configuration identification, configuration change control, configuration status monitoring, configuration audit, interface management, and release management. Through this, issue raising, action management, and baseline management will be implemented.