This paper analyzed design bearing capacities of pile foundations strengthened by pre-loading method for vertical expansion. The bearing capacities were investigated for two different pre-loading strategies: (1) after partial removals of structural/non-structural elements (e.g. finish, masonry wall etc.); and (2) after vertical expansions. Based on the numerical studies, more than 60% of the existing piles exceeded the design bearing capacities due to the difference of pre-loading strategies, which should be considered in structural design.