검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 10

        1.
        2023.05 구독 인증기관·개인회원 무료
        Korea currently has two permanent shutdown Nuclear Power Plants (NPPs), and the decommissioning project is expected to begin soon, starting with the first commercial NPP. The decommissioning project will eventually be the disposal of radioactive waste in the final stage of the work, and in that respect, proper tracking and history management should be well established in the management of waste. This is in line with the guidelines that regulatory agencies should also properly manage radioactive waste. Therefore, this study intends to examine the factors that should be considered in terms of tracking and management of radioactive waste in decommissioning nuclear facilities. The starting and final point of tracking radioactive waste generated during decommissioning is the physical inventory of the current as-is state and the final container. In this respect, the tracking of waste starts from the beginning of the dismantling operation. Thus, at the stage of approval of the decommissioning work, it may begin with an ID scheme, such as the functional location in operation for the target System, Structure, and Components (SSCs). As the dismantling work progresses, SSCs will be classified by nature and radiological level, which will be placed in containers in small packaging units. At this time, the small package should be given an ID. After that, the dismantling work leads to the treatment of waste, which involves a series of operations such as cutting, decomposition, melting, and decontamination. Each step in which these tasks are performed will be placed in a container, and ID assignment is also required. Until now, the small packaging container is for transfer after each treatment, and it is placed in the storage container in the final stage, at which time the storage container also gives a unique ID. Considerations for follow-up management were reviewed assuming solid waste, which is the majority of dismantled radioactive waste considered in this study. The ID system should be prepared from the start of the dismantling work, ID generation of the small transporting container and ID generation of the final disposal container during the intermediate waste treatment process, and each ID generation of the previous stage should be linked to each generation stage. In addition, each ID must be generated, and the definition of the grant scheme and attributes is required.
        2.
        2022.10 구독 인증기관·개인회원 무료
        To efficiently manage the waste packages like drums, it is meaningful to utilize the data of placement and emplacement of disposed waste in geological storage. For the transparent and real-time management of disposal data, both technical as well as administrative factors must be included. To this end, MIRAE-EN Co., Ltd. has developed a radioactive waste tracking and management system (m-trekⓇ v1.0) through radioactive waste management life cycle which is supported by KETEP. Enhancing the functional features of m-trekⓇ, IoT-based drum location measuring and data of those drums, such as position, radionuclides, activity, and dose etc., are to be collected and monitored through data modeling and visualization, which might be utilized in emplacing the loaded drums according to specifically certain criteria of internal and external data of disposal site. Position measuring using Beacon utilizes Received Signal Strength Indicator (RSSI) to locate the correct position in 3D area. Since RSSI is affected by the surrounding environment, it is required to corrective optimization. In addition, error and deviation of previously applied Gaussian filter method, was corrected and improved through AI learning model. According to this location information and those data, the prototype in future provides the visualization of drum position and its relevant data for administrative purpose such as monitoring, emplacement and other management policy.