검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 3

        1.
        2016.10 서비스 종료(열람 제한)
        The existing domestic bridge has become deterioration with the increase of bridges to be managed. Therefore appropriate maintenance such as an inspection, diagnosis, repair, and rehabilitation is required to extend the service life of the bridge. The domestic and international cases of the maintenance budget for bridges were investigated and analyzed. As a result, surveyed countries represent maintenance cost as only accounting values without clear and accurate categorized maintenance items.
        2.
        2011.03 KCI 등재 서비스 종료(열람 제한)
        This study analyzed the budget investment plans for the unit-project items(UPI) of 176 project districts for the rural village comprehensive development projects (RVCDP). This study classified the master plan reports of 176 project districts into 88 unit project items in aspect of project management, in order to analyze characteristics of distribution of budget in each project item. Most of all unit project items have similar types of uniform distribution with plus skewness in frequency pattern analysis except the total budget of the project district. This study analyzed the characteristics of budget distribution per province, year, and geographical types of region. Furthermore this paper also analyzed ratio of budget in unit project items to find out distribution pattern of each budget between project items over time. The hierarchical system for UPI of RVCDP consisted of three steps, which are 4 items of the first step on Strength of Rural-urban Exchange & Regional Capability (RURC), Green-income Infrastructure & Facility (GIF), Culture- health-welfare Facility, and Eco-environment & Landscape facility (ELF), 13 items for the second one, and 52 items for the third project items. From the results of the budget investment analysis for 5 years from 2004 to 2008, the budget investment ratios of RURC and ELF have steady state for every year, while GIF in decreasing and ELF in increasing over time. The ratios of UPI on infrastructure were decreased, whereas those on culture, health, and welfare were increased. Portion of tow project items among 52 items, which are community centers for village residents and rural experimental study facility, has 30% of total budget investment. Futhermore, the budget ratios of seven project items showed 50% of total budget. Average value of project budgets for five years was optimized as a type of exponential function in the case of decent array for ranking order.
        3.
        2008.02 KCI 등재 서비스 종료(열람 제한)
        본 연구에서는 기후학적 물수지 방법을 실제 유역에 적용하여 유역 상황을 모니터링하는 방법으로 구축하였다. 이 기후학적 물수지로부터 생성되는 과잉수분량은 유역에서의 지표면 유출 성분을 반영하여 홍수유출의 유추, 치수 구조물의 설치 및 운영에 관한 지표로 활용할 수 있으며, 부족수분량은 가뭄에 대한 정보를 취득할 수 있음을 알 수 있었다. 특히 이러한 두 가지 지표를 합성하여 얻어지는 습윤지표는 유역의 습윤상황뿐만 아니라 건조상황까지도 고려할 수 있으며,