Recently, new cities of Korean coastal area, connective land·bridge and marine structure are increased. However, actually the evaluation method of pile head strengthening performance is not clearly defined, and, in spite of many technology proposed, its qualitative evaluation is not made. Therefore, the fact is that the prefabricated pile head strengthening stability is not verified.
Therefore, it’s necessary to evaluate various technologies strategically and verify safety of precast file’s cap.