This research was performed to improve the bond strength of polymer concrete in the longspan bridge. Specimens were designed to 3 types; steel deck, steel deck attached dump and welding. In conclusion, Welding and dump type is higher than steel deck. Also, steel deck attached dump or welding to be arranged by 160mm is more effective than the others.