Tunnel built in the late 1970 is currently being used by maintenance. For the maintenance of the tunnel, tamping materials filled backside cavity occurred during construction. In this paper, By investigating the filling state of backside cavity, It is to evaluate the filling effects of backside cavity and the adequacy of the repair and reinforcement.