In this study, stability analysis was conducted for improved open-cut tunnel ground by preloading. The result of this study, vertical and unequal settlement was within the acceptable range. However, the field of soft ground can cause greater settlement than predicted. Therefore, the structure must be constructed in preparation for the differential settlement.