논문 상세보기

유압잭을 활용한 교대 측방변형 복원 사례연구

A Case Study on Recovering Lateral Movement of Bridge Abutment using Hydraulic Jacking Device

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/316970
서비스가 종료되어 열람이 제한될 수 있습니다.
한국구조물진단유지관리공학회 (The Korea Institute For Structural Maintenance and Inspection)
초록

Conventional approach for restraining additional lateral movement of bridge abutment is to decrease applied load by replacing rear ground with EPS block, ALC(autoclaved lightweight concrete), to increase soil resistance by applying tie-rod, geo-grid, permanent anchor, counterweight fill, and to increase lateral bearing capacity of soil by installing grouting, restraint pile. With properly restrained lateral movement of bridge abutment by applying those methods, the expansion joint and bridge bearing can be repaired after securing expansion joint gaps by cutting off concrete slabs and steel box girder. In this paper, the proposed approach for securing expansion joint gaps by restoring displaced bridge abutment to its original position with the use of hydraulic jacking device is discussed. By using hydraulic jacking device, cutting off concrete slabs and steel box girder is unnecessary.

저자
  • 배경태((주)대우건설 기술연구원, 선임연구원, 공학박사) | Bae Kyung-tae
  • 진병무((주)대우건설 기술연구원, 수석연구원, 공학박사) | Jin Byeong-Moo
  • 김인규((주)대우건설 기술연구원, 수석연구원, 공학박사) | Kim In-Gyu
  • 김영진((주)대우건설 기술연구원, 상무, 공학박사) | Kim Young-jin
  • 곽영준((주)대우건설 구리포천고속도로4공구현장, 소장) | Kwak Young-Jun