한국구조물진단유지관리공학회(The Korea Institute For Structural Maintenance and Inspection)
초록
In this study, We introduce a case of reconstruction of ASSM tunnel with various leakage paths. The Reconstruction method applied NATM waterproofing system to ASSM because of various leak paths and leakage
목차
Abstract 1. 서 론 2. 대상 터널 2.1 A터널 현황 2.2 A터널 주변 현황 2.3 A터널 내부상태 3. 결 론 참고문헌