The clogging of transverse drainage pipes in NATM tunnel is attributed to the hydraulic pressure generated on the outside of lining concrete and affects the safety of the whole structure in the long term, necessitating a keen attention in terms of its maintenance.
Accordingly, this paper will introduce an analysis on the effect of the clogging of transverse drainage pipes on the lining structure based on the comparison between the inspection of the clogging of transverse drainage pipes and the visual inspection (leakage, efflorescence).
Generally, the dew condensation generated in the tunnel does not directly affect the concrete structure However, falling water due to dew condensation brings directly with a high possibility of defection to the train line.
In addition, moisture inflow due to dew condensation may induce malfunction or failure of various electric and fire facilities installed in the tunnel, which may cause abnormal signals or accidents and so on. In this paper, we explain the case of dew condensation site and analyzed the cause.
As a result of the application in accordance with the assessment procedures given in the Detailed Guide (plan) for the precision safety diagnosis of the external tendon in Prestressed Concrete, it was evaluated with reasonable procedures and results.
In this study, We introduce a case of reconstruction of ASSM tunnel with various leakage paths. The Reconstruction method applied NATM waterproofing system to ASSM because of various leak paths and leakage
In Korea, inspection and precise safety diagnosis is regularly carried out to maintain and manage the main tunnel(NATM) which has been passed ten years after completion. In this study, we collected the laboratory test results of the concrete lining in the existing road and railway tunnels, and analyzed the correlation between compressive strength and unit mass of concrete. It is hoped that it will be used for efficient maintenance and management work of tunnels in the future.
In this study, Determine weight of damages, which were excerpt from analyzing inspection reports in Road Tunnel, using AHP technique. The result of weight of damages using AHP. is a slight difference from current weight one. So we need to think about this conclusion as new weight of damages in road tunnel.
This study compared the result applying two analysis methods based on Newmark Sliding Block theory to calculate permanent displacement that is an estimating factor for seismic safety of Fill Dam. It was analyzed FEM numerical coupled-analysis and Makdisi-Seed method. The permanent displacement for the body of dam during earthquake indicated similar displacements with each of them at the same seismic load.
Domestic social infrastructures have been rapidly growing based on economic growth in the 1970s. Recently, the construction of various methods has been continuously being carried out in accordance with the development of construction technology. Due to these influences, Maintenance work is becoming as important as construction.
Domestic social infrastructures have been rapidly growing based on economic growth in the 1970s. Recently, the construction of various methods has been continuously being carried out in accordance with the development of construction technology. Due to these influences, Maintenance work is becoming as important as construction.
Recently, the problem about a structural safety of the tunnel lining concrete is much raised. Thus, in this paper, We introduce a safety analysis case about an insufficient filling of the road tunnel(NATM) lining concrete for numerical analysis.
In this study, the behavior of the existing tunnel was measured by automation system to analyze the characteristics of lining longitudinal cracks. The characteristic of the infusion material which it is applicable to crack repairing was considered by grasping the overall behavior including the temperature and the crack width change, and etc., From this, the reasonable repair period for the complement efficiency enhancement was trying to be determined.
It is to confirm the various causes for cracks in concrete lining and understand the reasons for major cracks by analyzing on-site constructional conditions. Also, it is to identify the bahavior of concrete lining for its main cause of cracks.
정밀안전진단시 콘크리트 강도를 추정하기 위한 방법으로 강도추정식을 이용한 방법이 많이 사용되며, 이용되는 추정식은 외국에서 이미 제안된 식이 대부분이고, 적용되는 추정식에 따라서 추정강도의 차이가 심하게 발생하며, 전반적으로 강도추정의 신뢰도가 낮아져 정밀안전진단 결과의 신뢰성에도 상당한 영향을 미친다. 이런 문제점은 일부 국한된 부분에서 발생하게 되어 다수의 실험을 통하여 신뢰도를 높일 수 있다. 본 논문은 이와 같은 필요성을 포괄하기 위해 실내압축강도와 관련된 신뢰도 평가식을 제안하였다. 확률론적 기법을 이용하여 신뢰도 평가식의 유용성을 검증하였으며 실내압축강도와 추정압축강도의 추이 그래프를 비교하였다. 비교결과, 본 연구에서 제시된 신뢰도 평가식의 유용성을 확인하였다.
Generally, Seismic design has not been applied for the existing('now-using' means) railway tunnel. therefore, In this case study, We introduce a case of seismic performance evaluation for tunnels. It is evaluated by comparing capacity with demand for tunnel linings.
Recently, it is more concerned about securing of its seismic safety, as underground structures are significantly recognized. Especially, it is very important that underground structures such as the tunnel of urban railroad or subway ensure the seismic safety of its, because it can be caused an enormous loss of lives and a economical damage by earthquake. When the subway tunnel of cut-and-cover box type is constructed, grounds are excavated and refilled.
In this study, the parametric study is performed and analyzed about factors affecting seismic analysis of cut-and-cover tunnel, such as soil type, refilled range, tunnel location, etc. Consequently, it is hoped to provide the preliminary data for a better reasonable review on seismic design and seismic performance assessment of underground structures.
Existing tunnel and digging and construction of the center tunnel wall construction process was, including constructing additional a 2-Arch Tunnel is disadvantageous the workability and workday. In addition, the central wall (girder) due the complex waterproof, multiple, as leaks and has a structure plan requires proper Maintenance Methods.
본 연구에서는 반횡류식 터널 덕트슬래브 하면 중앙부에 발생한 종방향 균열의 발생 원인을 분석하였다. 분석을 수행하기 위하여 균열이 발생 부위에 대한 상세한 외관조사, 비파괴조사 및 덕트슬래브의 처짐 측량을 실시하였고, 그 결과와 수치해석결과와의 상관관계 분석을 수행하여 균열 발생 원인에 대한 상세한 분석을 실시하였다. 균열 발생 원인의 주요 인자로 단부구속조건, 철근의 위치, 온도의 변화 및 건조수축 등으로 분류하였고, 콘크리트 라이닝을 우선적으로 타설하고 덕트슬래브를 철근 커플러로 강결하여 수개월 후에 별도 타설한 시공여건에 따라 발생할 가능성이 있는 요소들을 고려하여 수치해석을 실시하였다. 특히, 건조수축에 대한 분석을 위하여 ACI209 및 콘크리트 구조설계기준의 예측식과 기존 연구의 실험결과를 비교하여 시공당시의 건조수축 발생량을 예측하였고 구조해석을 수행하여 건조수축이 균열발생의 주요한 원인 중에 하나라는 결과를 도출하였다. 이에 따라 기존에 수행한 도로터널의 안전진단 결과를 덕트슬래브의 시공 방법에 따라 분류하고 균열발생 패턴을 분석하여 덕트슬래브가 있는 터널의 시공방법의 개선에 대한 제언을 하였다.
본 연구에서는 열차 진행에 따른 진동이 지하철 박스구조물에 미치는 영향에 대해서 분석을 수행하였다. 이를 위하여 지하철 본선에 센서를 설치하고 지하철이 운행 시간대의 열차진동 데이터를 획득하였다. 센서의 위치는 하부보, 측벽, 상부슬래브에 설치하였고, 자갈도상부와 콘크리트도상부의 하부보와 측벽에 각각 센서를 부착하여 부재의 위치 및 도상의 종류에 따른 진동의 영향을 분석하였다. 하부보와 상부슬래브의 동적응답을 분석한 결과 하부보의 진동속도에 비하여 상부슬래브의 진동속도는 작은 것으로 분석되었고, 상부슬래브 균열의 폭에 대한 변화도 없는 것으로 분석되어 진동의 영향이 상부슬래브까지 미치지 않는 것으로 분석되었다. 자갈도상과 콘크리트도상의 위치에서 하부보와 측벽의 가속도를 비교한 결과 콘크리트 도상의 약간 큰 것으로 나타났으나 그 차가 크지 않아 도상의 차이에 따른 정량적인 분석은 추후에 추가적인 연구를 통하여 분석하여야 할 것으로 판단된다. 구조물의 진동을 평가하기 위해서 가속도 이력을 속도이력으로 변환하여 기존의 승강장에서 수집된 진동 속도 데이터와 비교하였으며, 승강장보다는 본선의 진동속도가 더 빠른 것을 확인할 수 있었다. 금번 연구를 통하여 정밀안전 시에 지하철의 진동을 측정하여 구조물의 평가를 처음으로 시도하였으며 추후 연구에서는 측정 분해능을 보다 세밀하게 하고 측정 개소를 다양화하여 보다 세밀한 분석을 수행하는 연구가 필요할 것으로 판단된다.