In this paper, we propose a case study to treat planning and scheduling in factory of supply chain. In fact, the planning and the scheduling of a factory are not easily solved because of constraints of facility resources, material requirements, allowed planning times, and so on. However many packages are developed by vendors in Advanced Planning and Scheduling(APS) aspects to solve these problems. We, therefore, analyze problems of an electronic company and apply the tool, Factory Planner(FP), to solve problems.