논문 상세보기

A Case Study on Lead Time Improvement Using a Simulation Approach KCI 등재

시뮬레이션 방식을 이용한 리드 타임 개선 사례 연구

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/408598
구독 기관 인증 시 무료 이용이 가능합니다. 4,500원
한국산업경영시스템학회지 (Journal of Society of Korea Industrial and Systems Engineering)
한국산업경영시스템학회 (Society of Korea Industrial and Systems Engineering)
초록

During the shift from gasoline vehicles to electric ones, auto parts manufacturing companies have realized the importance of improvement in the manufacturing process that does not require any layout changes nor extra investments, while maintaining their current production rate. Due to these reasons, for the auto part manufacturing company, I-company, this study has developed the simulation model of the PUSH system to conduct a process analysis in terms of production rate, WIP level, and logistics work’s utilization rate. In addition, this study compares the PUSH system with other three manufacturing systems -KANBAN, DBR, and CONWIP- to compare the performance of these production systems, while satisfying the company’s target production rate. With respect to lead-time, the simulation results show that the improvement of 77.90% for the KANBAN system, 40.39% for the CONWIP system, and 69.81% for the DBR system compared to the PUSH system. In addition, with respect to WIP level, the experimental results demonstrate that the improvement of 77.91% for the KANBAN system, 40.41% for the CONWIP system, and 69.82% for the DBR system compared to the PUSH system. Since the KANBAN system has the largest impacts on the reduction of the lead-time and WIP level compared to other production systems, this study recommends the KANBAN system as the proper manufacturing system of the target company. This study also shows that the proper size of moving units is four and the priority allocation of bottleneck process methods improves the target company’s WIP and lead-time. Based on the results of this study, the adoption of the KANBAN system will significantly improve the production process of the target company in terms of lead-time and WIP level.

목차
1. 서 론
2. 문헌연구
3. 자동차 부품업체의 공정 현황 및 문제
    3.1 대상기업 현황
    3.2 I사 공장 문제점
4. 시뮬레이션을 활용한 생산시스템 개선
    4.1 시뮬레이션 기준정보
5. 결론 및 연구방향
References
저자
  • Wonju Ro(창원대학교 스마트제조융합협동과정) | 노원주
  • Jaehun Sim(창원대학교 스마트제조융합협동과정) | 심재훈 Corresponding Author