논문 상세보기

현무암 골재 아스팔트 혼합물 물성평가 및 현장시공을 통한 보수수준별 공용성능 평가 KCI 등재

Evaluation of asphalt mixture using basalt aggregate and performance according to rehabilitation levels through on-site construction

  • 언어KOR
  • URLhttps://db.koreascholar.com/Article/Detail/428563
구독 기관 인증 시 무료 이용이 가능합니다. 4,000원
한국도로학회논문집 (International journal of highway engineering)
한국도로학회 (Korean Society of Road Engineers)
초록

PURPOSES : In this study, the basis for improving the maintenance method of road pavement in Jeju Island, where deterioration is accelerating, was presented through field construction and analysis of various combinations of maintenance methods. METHODS : Construction was performed on Jeju Island's Aejo Road, which has high traffic and frequent early damage, using various asphalt mixtures mainly applied in Jeju Island, with different maintenance cross-sections depending on the level of repair. The quality and performance of the asphalt mixture collected during construction were evaluated, and MEPDG was used to analyze the service life according to the type and maintenance level of the mixture. RESULTS : While the mixture for the surface layer satisfied the quality standards and had excellent rutting and moisture resistance performance, the asphalt mixture for the intermediate and base layer did not satisfy the quality standards such as air voids, so it was judged that quality control was necessary during production. The section repaired to the base layer was found to be advantageous for the integrated behavior of the pavement and had the best structural integrity. As a result of predicting the service life, the estimated life of the section where only the surface layer was repaired was analyzed to be approximately 7 years, the section where the intermediate layer was repaired was 14.5 years, and the section where the entire section up to the base layer was repaired was analyzed to be 18 years. CONCLUSIONS : In Jeju Island, where deterioration is accelerating, it was analyzed that when establishing a maintenance plan, it is necessary to consider repairing the middle and base floors in order to secure the designed life of 10 years.

목차
1. 서론
2. 제주도 현무암 아스팔트 생산 및 시공 분석
    2.1. 현장 시공 개요
    2.2. 현장 생산 아스팔트 혼합물의 성능 평가
    2.3. 시공후 현장 공용성 평가
3. MEPDG를 활용한 공용수명 분석
    3.1. 입력변수 설정
    3.2. 시공 구간별 공용수명 분석
4. 결론
감사의 글
저자
  • 백철민(정회원 · 한국건설기술연구원 도로교통연구본부 수석연구원) | Baek Cheolmin (Senior Researcher Department of Highway and Transportation Research, Korea Institute of Civil Engineering and Building Technology 283, Goyangdae-Ro, Ilsanseo-Gu, Goyang-Si, Gyeonggi-Do 10223, Korea) 교신저자
  • 한수현(정회원 · 한국건설기술연구원 도로교통연구본부 박사후연구원) | Han Soohyun
  • 이종원(정회원 · 한국건설기술연구원 도로교통연구본부 박사후연구원) | Lee Jongwon
  • 박희범(정회원 · 한국건설기술연구원 도로교통연구본부 수석연구원) | Park Heebeom
  • 양성린(정회원 · 한국건설기술연구원 도로교통연구본부 수석연구원) | Yang Sunglin
  • 안덕순(정회원 · 한국건설기술연구원 도로교통연구본부 연구위원) | An Deok-Soon