Kori-1 and Wolseong-1 nuclear power plants were permanently shut down in June 2017 and December 2019, and are currently in the preparation stage for decommissioning. In this regard, it is necessary to secure nuclear power plant decommissioning capacity in preparation for the domestic decommissioning marketplace. To address this, the Korea Research Institute of Decommissioning (KRID) was established to build a framework for the development of integrated nuclear decommissioning technology to support the nuclear decommissioning industry. The institute is currently under construction in the Busan-Ulsan border area, and a branch is planned to be established in the Gyeongju area. Recently, R&D projects have been launched to develop equipment for the demonstration and support verification of decommissioning technology. As part of the R&D project titled “Development and demonstration of the system for radioactivity measurement at the decommissioning site of a nuclear power plant”, we introduce the plan to develop a radioactivity measurement system at the decommissioning site and establish a demonstration system. The tasks include (1) measurement of soil radioactive contamination and classification system, (2) visualization system for massive dismantling of nuclear facilities, (3) automatic remote measurement equipment for surface contamination, and (4) bulk clearance verification equipment. The final goal is to develop a real-time measurement and classification system for contaminated soil at the decommissioning site, and to establish a demonstration system for nuclear power plant decommissioning. The KRID aims to contribute and support the technological independence and commercialization for domestic decommissioning sites remediation of nuclear power plant decommissioning site by establishing a field applicability evaluation system for the environmental remediation technology and equipment demonstration.