In this paper considered is the provisioning quantity determination problem of consumable concurrent spare parts (CSP) of a new equipment system to minimize the procurement cost under the operational availability constraint. When a part fails, repair of t
Considered is the concurrent spare part(CSP) requirements problem of new equipment system. In the considered system, when a part fails, the part cannot be repaired and should be replaced. In addition, cannibalization is allowed. It is assumed that the fai