검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2015.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        This study focused on evaluating the efficiency of the removal of non-point source pollution by Daecheong Lake Juwon Stream constructed wetlands. The constructed wetland system is a surface flow type designed in the year 2007 for purifying eutrophic water of Daecheong Lake Juwon Stream. The value of conductivity, suspended solids(SS), chemical oxygen demand using a potassium permanganate(CODMn), five-day biochemical oxygen demand(BOD5), total nitrogen(T-N), total phosphorous(T-P), and pH in inflow averaged 220.2, 2.46, 3.33, 1.34, 2.00, 0.04 mg/L and 7.24, respectively and in outflow averaged 227.9, 1.12, 3.34, 0.87, 1.16, 0.02 mg/L and 7.45, respectively. The average removal efficiency of constructed wetlands was 30 % for SS, 22 % for BOD5, 45 % for T-N and 31 % for T-P. The removal rates of SS, BOD5 and T-N in the spring, summer and autumn were higher than those in winter. The removal rate of T-P was not significant different in all seasons. The amounts of pollutants removal in the constructed wetlands were higher in the order of 3rd ‹ 2nd ‹ 1st wetland for SS and T-P, 2nd ‹ 3rd ‹ 1st wetland for BOD5 and T-N. Therefore, our findings suggest that the constructed wetlands could well treat the eutrophic Daecheong Lake Juwon Stream waters.
        4,300원