        In this study, we suggested the jacking method of small diameter sewer pipe for improving workability of the pipe at the weak ground. The jacking method minimizes the space and time in constructing small diameter sewer pipe. In addition, to use this method do not cause road restrictions during the construction period. In this study, the construction process of the small diameter sewer pipe is explained. In addition, to ensure the safety during construction, the design consideration such as earth pressure and the jacking force of the steel pipe, and safety against boiling of the ground were examined. For verify the safety of this jacking method, it is necessary to carry out an experiment to estimate the safety of main pipe under construction.