검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 2

        1.
        2004.10 구독 인증기관 무료, 개인회원 유료
        The Sustainable Water Resources Research Center (SWRRC) was established to manage water resources in an integrated manner and has been supported as a part of the 21st Frontier Research and Development Program by the Ministry of Science and Technology (MOST) and Ministry of Construction and Transportation since August 2001. The mission of the SWRRC is to cope with future water shortage problems through development and implementation of technologies of integrated water resources management. This mission ultimately aims at improving of living standards of human being, which is one of the major goals of the 21st Frontier Research and Development Program. The project is conducted by three phases. Duringthe first phase (2001. 8 ~ 2004. 6), the majority of funding is used for development of core and supporting technologies. In the second phase (2004. 7 ~ 2007. 6), with the core and supporting technologies financed continuously, the fund will be usedon different parts of studies in terms of sectors, subjects and integrated researches, and the rest of the fund (50%) will go toward implementation combined with business in the form of providing technologies. In the final phase (2007. 7 ~ 2011. 6), 30% of the fund will be used to integrate developed systems and 70% will be spent on implementation for selected areas to which newly developed technologies will be applied Project Management System for Water resources R&D is cost-effective and well fitted system by resolving many kind of problems facing such a large research and development program considering limited manager.
        4,800원
        2.
        2018.04 서비스 종료(열람 제한)
        This paper reviews the requirements of the sound - absorbing block for the maintenance of the concrete track and suggests ways to solve it. It is applied to the design and production by preparing the shape improvement plan so that the cracks of the road can be observed. In order to secure safety by tunnel lift in the tunnel, the lift generated by computational fluid dynamics analysis is examined to confirm the safety of the sound absorption block.