Grouted connections have been widely used for offshore structures such as connection method of jacket and mono-pile structures. It is recommended high strength concrete for grouting between pile and sleeve because it is so rapidly hardening that helpful to fatigue strength. This study investigates axial strength of pile to sleeve grouted connections made by 130MPa of high strength concrete. Push-out test were performed to evaluate the axial strength of the grouted connections with different shear-key spacing.