검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2017.04 서비스 종료(열람 제한)
        A new high-rise building in downtown before Underground excavation work, These steps are conducted such as RMR analysis, Schmidt Hammer Test, and Rock Mass Classification by Breakability, After that rock digging work will begin.