검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 23

        1.
        2023.03 구독 인증기관 무료, 개인회원 유료
        3,000원
        2.
        2022.08 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES : In this study, the amount of core stone breaking in the size of boulders by excavator braker work was analyzed quantitatively through on-site test construction. In addition, the factors affecting workload were studied. METHODS : In the field test, 30 core stones of boulder sizes (1–4 m3) that appeared during earthworks, such as road construction and site construction, were collected from three locations, and the rock breaking work was carried out simultaneously using three excavator breakers(1.0-m3 volume). During the core stone breaking, progress was analyzed through video recordings. RESULTS : After the completion of rock breaking, the amount of breaking work was analyzed by direct loading and weighing using a 15- ton dump truck. As a result of the test construction, there was a significant difference in the amount of work completed per hour. CONCLUSIONS : It was found that the results were greatly affected by not only the performance of the excavator braker equipment, but also the skill of the driver and the size of the core stones.
        4,000원
        3.
        2021.12 구독 인증기관·개인회원 무료
        4.
        2021.06 구독 인증기관·개인회원 무료
        5.
        2021.03 구독 인증기관·개인회원 무료
        7.
        2020.06 구독 인증기관·개인회원 무료
        8.
        2020.03 구독 인증기관·개인회원 무료
        9.
        2019.12 구독 인증기관·개인회원 무료
        10.
        2019.09 구독 인증기관·개인회원 무료
        11.
        2017.06 구독 인증기관·개인회원 무료
        14.
        2016.09 구독 인증기관 무료, 개인회원 유료
        4,000원
        15.
        2015.12 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES: It is difficult to estimate tunnel stability because of lack of timely information during tunnel excavation. Tunnel deformability refers to the capacity of rock to strain under applied loads or unloads during tunnel excavation. This study was conducted to analyze a methods of pre-evaluation of stability during tunnel construction using the critical strain concept, which is applied to the results of tunnel settlement data and unconfined compression strength of intact rock or rock mass at the tunnel construction site. METHODS: Based on the critical strain concept, the pre-evaluation of stability of a tunnel was performed in the Daegu region, at a tunnel through andesite and granite rock. The critical strain concept is a method of predicting tunnel behavior from tunnel crown settlement data using the critical strain chart that is obtained from the relationship between strain and the unconfined compression strength of intact rock in a laboratory. RESULTS: In a pre-evaluation of stability of a tunnel, only actually measured crown settlement data is plotted on the lower position of the critical strain chart, to be compared with the total displacement of crown settlement, including precedent settlement and displacement data from before the settlement measurement. However, both cases show almost the same tunnel behavior. In an evaluation using rock mass instead of intact rock, the data for the rock mass strength is plotted on the lower portion of the critical strain chart, as a way to compare to the data for intact rock strength. CONCLUSIONS : From the results of the pre-evaluation of stability of the tunnel using the critical strain chart, we reaffirmed that it is possible to promptly evaluate the stability of a tunnel under construction. Moreover, this research shows that a safety evaluation using the actual instrumented crown settlement data with the unconfined compression strength of intact rock, rather than with the unconfined compression strength of a rock mass in the tunnel working face, is more conservative.
        4,000원
        17.
        2014.04 KCI 등재 구독 인증기관 무료, 개인회원 유료
        PURPOSES: The purpose of this study is to develop the U-turn accident model at 4-legged signalized intersections in urban areas. METHODS : In order to analyze the characteristics of the accidents which are associated with U-turn operation at 4-legged signalized intersections in urban areas and develop an U-turn accident model by regression analysis, the tests of overdispersion and zero-inflation are conducted about the dependent variables of number of accidents and EPDO (Equivalent Property Damage Only). RESULTS: As their results, the Poisson model fits best for number of accident and the ZIP (Zero Inflated Poisson) fits best for EPOD, the variables of conflict traffic, width of opposing road, traffic passing speed are adopted as independent variable for both models. The variables of number of bus berths and rate of U-turn signal time at which the U-turn is permitted are adopted as independent variable only for EPDO. CONCLUSIONS: These study results suggest that U-turn would be permitted at the intersection where the width of opposing road is wider than 11.9 meters, the passing vehicle speed is not high and U-turn operation is not hindered by the buses stopping at bus stops.
        4,200원
        1 2