검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 1

        1.
        2024.09 KCI 등재 구독 인증기관 무료, 개인회원 유료
        In modern society, buildings are becoming more complex, and the population is becoming more densely populated. Such large buildings require a variety of evacuation measures, as there is a high possibility of large-scale human casualties due to increased evacuation distance and evacuation time in the event of a fire. Strobe light and exit sign light are used as important evacuation equipment to provide early warning and evacuation directions. In this thesis, we conducted a fire simulation assuming that a fire occurrence point notification function and a strobe light function were added to equipment such as visual alarms and evacuation guidance, and compared and analyzed the difference in evacuation completion time with existing equipment. The scenarios for the simulation were divided into “general fire situations” and “fire location and evacuation exit guidance situation” and the differences in evacuation completion time in the event of a fire were compared and analyzed for each floor from the 1st floor to the 3rd floor. The maximum travel distance to complete evacuation in the case of a fire on the first floor decreased by 80.6 m and the evacuation completion time decreased by 329.4 seconds, and the maximum travel distance to complete evacuation in the case of a second-floor fire decreased by 28.5 m and the evacuation completion time by 438.8 seconds. During the fire on the third floor, the maximum distance decreased until evacuation was completed to 3.4 m, and the evacuation completion time was reduced by 355.6 seconds. It is expected that if the congestion level of evacuation routes is reduced by utilizing the congestion level of evacuation exits when fire alarm systems and evacuation equipment are activated, the evacuation completion time will be further shortened and evacuations will be carried out quickly and safely.
        4,300원