검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 6

        1.
        2023.11 구독 인증기관·개인회원 무료
        KHNP is conducting research to decommission Wolsong Unit 1 Calandria. Establishment of preparation and dismantlement processes, conceptual design of equipment and temporary radiation protection facilities, and waste management are being established. In particular, the ALARA plan is to be established by performing exposure dose evaluation for workers. This study aims to deal with the methodology of evaluating exposure dose based on the calandria dismantling process. The preparation process consists of bringing in and installing tooling and devices, and removing interference facilities to secure work space. The main source term for the preparation process is the calandria structure itself and crud of feeders. In the case of the dismantlement process, a structure with a shape that changes according to the process was modeled as a radiation source. It is intended to estimate the exposure dose by selecting the number of workers, time, and location required for each process in the radiation field evaluated according to the preparation and dismantlement process. In addition, it is also conducting an evaluation of the impact on dust generated by cutting operations and the human impact of C-14, H-3, which are specialized nuclides for heavy water reactors. KHNP is conducting an exposure dose evaluation based on a process based on the preparation and dismantlement process for decommissioning Calandria through computation code analysis. If additional worker protection measures are deemed necessary through dose evaluation according to this methodology, the process is improved to prepare for the dismantling of worker safety priorities.
        2.
        2023.11 구독 인증기관·개인회원 무료
        The radiological characterization of SSCs (Structure, Systems and Components) plays one of the most important role for the decommissioning of KORI Unit-1 during the preparation periods. Generally, a regulatory body and laws relating to the decommissioning focus on the separation and appropriate disposal or storage of radiological waste including ILW (intermediate level waste), LLW (low level waste), VLLW (very low level waste) and CW (clearance waste), aligned with their contamination characteristics. The result of the preliminary radiological characterization of KORI Unit-1 indicated that, apart from neutron activated the RV (reactor vessel), RVI (reactor vessel internals), and BS (biological shielding concrete), the majorities of contamination were sorted to be less than LLW. Radiological contamination can be evaluated into two methods. Due to the difficulties of directly measuring contamination on the interior surfaces of the pipe, called CRUD, the assessment was implemented by modeling method, that is measuring contamination on the exterior surfaces of the pipes and calculating relative factors such as thickness and size. This indirect method may be affected by the surrounding radiation distribution, and only a few gamma nuclides can be measured. Therefore, it has limitation in terms of providing detailed nuclide information. Especially, α and β nuclides can only be estimated roughly by scaling factors, comparing their relative ratios with the existing gamma results. To overcome the limitation of indirect measurement, a destructive sampling method has been employed to assess the contamination of the systems and component. Samples are physically taken some parts of the systems or components and subsequently analyzed in the laboratory to evaluate detailed nuclides and total contamination. For the characterization of KORI Unit-1, we conducted the radiation measurement on the exterior surfaces of components using portable instruments (Eberline E-600 SPA3, Thermo G20-10, Thermo G10, Thermo FH40TG) at BR (boron recycle system) and SP (containment spray system) in primary system. Based on these results, the ProUCL program was employed to determine the destructive sample collection quantities based on statistical approach. The total of 5 and 8 destructive sample quantities were decided by program and successfully collected from the BR and SP systems, respectively. Samples were moved to laboratory and analyzed for the detail nuclide characteristics. The outcomes of this study are expected to serve as valuable information for estimating the types and quantities of radiological waste generated by decommissioning of KORI Unit-1.
        3.
        2023.05 구독 인증기관·개인회원 무료
        As an initial part of Kori-1 & Wolsung-1 Unit decommissioning planning, a characterization plan is developed to define the nature, extent and location of contaminants, determine sampling locations and protocols, determine quality assurance objectives for characterization, and define documentation requirements. The actual characterization of a facility is an iterative process that involves initial sampling according to the characterization plan, field management (such as labeling, packaging, storing, and transport) of the samples, laboratory analysis, conformance to the data quality objectives (DQOs), and then identifying any additional sampling required, refining the DQOs, and modifying the characterization plan accordingly. The final product of the facility characterization is a document that describes the type, amount, and location of contaminants that will require consideration and removal during the decommissioning operations sufficient to prepare a decommissioning plan. In this study, implementing a characterization plan, developed in accordance with this standard, will result in obtaining or deriving the above information.
        4.
        2023.05 구독 인증기관·개인회원 무료
        Kori Nuclear Power Plant Unit 1, which began operating in 1978, is Korea’s oldest commercial nuclear reactor. The reactor was permanently shut down in June 2017, and now the decommissioning process has begun. The decommissioning process will generate a significant amount of waste that requires appropriate management to minimize the impact on the environment and human health. And the waste routing, i.e. the activities and logistics for managing the material generated, is a key point in a decommissioning project. It determines the routes from the material inventory to the envisaged material end states. In this study, we review on several factors for the selection of the waste routes in a decommissioning project. In terms of sustainability, the ‘waste hierarchy’ should be applied to routing materials from nuclear facilities. According to the waste hierarchy, the preferred end state is reuse or recycling of the waste as material or, more preferably, the avoidance of waste generation. In addition, treatments (such as decontamination and thermal treatment) that can reduce the volumes requiring disposal as radioactive waste should be considered. Another important parameter is the need to secure availability and capacity of waste routes. Short-term bottlenecks or any delay in the removal of the waste from the site often has an impact on other site activities. If possible, at least two alternative waste routes should be identified for the main categories of waste and kept available throughout the decommissioning project. All routes should be direct to the material end state if possible, but it is more important that waste is removed from the site so that other site operations are not impeded.
        5.
        2023.05 구독 인증기관·개인회원 무료
        KHNP is carrying out international technical cooperation and joint research projects to decommission Wolsong unit 1 reactor. Construction data of the reactor structures, experience data on the pressure tube replacement projects, and the operation history were reviewed, and the amount of dismantled waste was calculated and waste was classified through activation analysis. By reviewing COG (CANDU owners Group) technical cooperation and experience in refurbishment projects, KHNP’s unique Wolsong unit 1 reactor decommissioning process was established, and basic design of a number of decommissioning equipment was carried out. Based on this, a study is being conducted to estimate the worker dose of dismantling workers. In order to evaluate the dose of external exposure of dismantling workers, detailed preparation and dismantling processes and radiation field evaluation of activated structures are required. The preparation process can be divided into dismantlement of existing facilities that interfere with the reactor dismantling work and construction of various facilities for the dismantlement process. Through process details, the work time, manpower, and location required for each process will be calculated. Radiation field evaluation takes into account changes in the shape of structures by process and calculates millions of areas by process, so integrated scripts are developed and utilized to integrate input text data. If the radiation field evaluation confirms that the radiation risk of workers is high, mutual feedback will be exchanged so that the process can be improved, such as the installation of temporary shields. The results of this study will be used as basic data for the final decommissioning plan for Wolsong unit 1. By reasonably estimating the dose of workers through computer analysis, safety will be the top priority when decommissioning.
        6.
        2023.05 구독 인증기관·개인회원 무료
        Prevention of radiation hazards to workers and the environment in the event of decommissioning nuclear power plants is a top priority. To this end, it is essential to continuously perform radiation characterization before and during decommissioning. In operating nuclear power plants, various detectors are used depending on the purpose of measurement. Portable detectors used in power plants have excellent portability, but there is a limit to the use of a single measuring device alone to quantify radioactive contamination, nuclide analysis, and ensure representation of measurement results. In foreign countries, gamma-ray visualization detectors are being actively used for operating and decommissioning nuclear power plants. KHNP is also conducting research on the development of gamma-ray visualization detectors for multipurpose field measurement at decommissioning nuclear power plants. It aims to develop detectors capable of visualizing radioactive contamination, analyzing nuclides, estimating radioactivity, and estimating dose rates. To this end, we are developing related software according to the development process by purchasing sensors from H3D, which account for more than 75% of the US gamma-ray visualization detector market. In addition, field tests are planned in the order of Wolsong Unit 1 and Kori Unit 1 with Research reactor in Gongneung-dong in accordance with the progress of development. The detector will be optimized by analyzing the test results according to various gamma radiation field environments. The development detector will be used for various measurement purposes for Kori unit 1 and Wolsong