        After the decision of the Wolsong unit 1 permanent shutdown (2019), spent fuel stored in the spent fuel bay (hereafter, SFB) should be transported to a dry storage facility (MACSTOR or Canister) in order to decommission Wolsong unit 1. Accordingly, KHNP has established a shipment schedule for damaged fuel of Wolsong Unit 1 and is trying to complete the shipment according to the schedule. Wolsong is equipped with transportation casks and dry storage facilities, but baskets need to be manufactured separately. In addition, license approval is required for baskets, transport cask, and dry storage facilities for legal grounds to contain, transport, and store damaged fuels. In this paper, the initial model, upgrade model, and automation model of encapsulation equipment planned to be introduced in Canada to handle PHWR’s damaged fuel were compared, and the optimal model was selected in consideration of KHNP’s planned spent fuel shipment schedule. The PHWR’s damaged fuel encapsulation system is a system developed the PHWR’s damaged spent fuel to be handled in the same way as the existing PHWR when storing it in the dry storage facility and loading a basket for capsulation into transport cask. At the Gentilly-2 nuclear power plant in Canada, a manually operated encapsulation system was used due to the low quantity of damaged fuel, which can be encapsulated two bundles a day, and this model is an initial model. In the case of Wolsong Unit 1, it has about 300 damaged fuels, so it takes about nine months to work when using the initial model. The upgrade model developed to improve work efficiency and reliability has increased work efficiency through some automation, but it would take about eight months to process the damaged spent fuels of Wolsong Unit 1, and this model has not yet been manufactured and applied. Lastly, the automation model changed the work location outside the SFB and automated drainage/drying operations. It is easy to maintain and replace consumables because the work is carried out by lifting the damaged fuel to a shuttle outside the SFB surrounded by a shielding chimney. Considering the reduction of drainage/drying time, it is possible to save about four times as much time as the initial model. That is, if the automation model is used, it is judged that the supply of Wolsong Unit 1 can be processed in about two months. However, in terms of license, initial model and upgrade model are expected to be easier and the period is expected to be shortened. However, if licensing is carried out as soon as equipment design is completed, it is believed that the period can be shortened by parallel equipment manufacturing and licensing. It is judged that the best way to comply with the target schedule is to select an automation model with excellent work performance, develop equipment, and proceed with licensing at the same time. Accordingly, KHNP is in the process of designing equipment with the aim of using the automation model to take out damaged fuel for Wolsong Unit 1.
        2.
        2023.05 구독 인증기관·개인회원 무료
        The treatment of waste generated during operation as a part of preparation for decommissioning is coming to the fore as a pending issue. Non-fuel waste stored in the spent fuel pool (SFP) of PWRs in Korea includes Dummy fuel, damaged fuel rod storage container, reactor vessel specimen cask, spent in-core instrumentation, spent control element assemblies, spent neutron source assemblies, burnable poison rods, etc. In order to treat such waste, it is necessary to classify radioactive waste level and analyze kinds of nuclide in accordance with legal requirements. In order to solve the problem, the items that KHNP-CRI is trying to conduct like followings. First, KHNP-CRI will identify the current status of non-fuel waste stored in the SFP of all domestic nuclear power plants. In order to consider the treatment of non-fuel waste, it is essential to know what kind of items and how many items are stored in the SFP. Second, to identify the dimension and characteristics of non-fuel waste stored in the SFP would be conducted. The configuration of non-fuel waste is important information to handle them. Third, the way to handle non-fuel waste would be deduced including analysis of their dimension, whether the equipment should be developed to handle each kind of non-fuel waste or not, how to transport them. In order to classify radioactive waste level and analyze the nuclide for the non-fuel waste, handling tools and the cask to transport them into the facility which nuclide analysis is able to be performed would be required. Fourth, the nuclide analysis technology would be identified. Also, domestic holding technology would be identified and which technology should be developed to classify the radioactive waste level for the non-fuel waste would be deduced. This preliminary study will provide KHNP-CRI with the insight for the nuclide analysis technology and future work which is following action for the non-fuel waste. Based on the result of above preliminary study, the feasibility of the research for the treatment of non-fuel waste would be evaluated and research plan would be established. In conclusion, the treatment of non-fuel waste stored in the spent fuel pool of domestic PWR should be considered to prepare the decommissioning. KHNP-CRI will identify the quantity, the dimension and kinds of non-fuel waste in the SFP of domestic PWR. Also, the various nuclide analysis technology would be identified and the technology which should be developed would be defined through this preliminary study.
        3.
        2022.06 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        Spent filters with a high radiation dose rate of 2 mSv·hr−1 or more are not easily managed. So far, the Korean policy for spent filter disposal is to store them temporarily at nuclear power plants until the waste filters can be easily managed. Nuclear power plant decommissioning in Korea is starting with Kori unit 1. Volume reduction of waste generated during decommissioning can reduce the cost and optimize the space usage at disposal site. Therefore, efficient volume reduction is a very important factor during the decommissioning process. A conceptual method, based on the experiences of developing 200 and 800 ton compactors at Orion EnC, has been developed considering worker exposure with the followings a crusher (upgrade of compaction efficiency), an automatic dose measuring system with a NaI(Tl) detector, a shield box, an inner drum to prepare for easy handling of drums and packaging, a 30 ton compactor, and an automatic robot system. This system achieves a volume reduction ratio of up to 85.7%; hence, the system can reduce the disposal cost and waste volume. It can be applied to other types of wastes that are not easily managed due to high dose rates and remote control operation necessity.
        4,200원
        4.
        2022.03 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        In decommissioning a nuclear power plant, numerous concrete structures need to be demolished and decontaminated. Although concrete decontamination technologies have been developed globally, concrete cutting remains problematic due to the secondary waste production and dispersion risk from concrete scabbling. To minimize workers’ radiation exposure and secondary waste in dismantling and decontaminating concrete structures, the following conceptual designs were developed. A micro-blast type scabbling technology using explosive materials and a multi-dimensional contamination measurement and artificial intelligence (AI) mapping technology capable of identifying the contamination status of concrete surfaces. Trials revealed that this technology has several merits, including nuclide identification of more than 5 nuclides, radioactivity measurement capability of 0.1–107 Bq·g−1, 1.5 kg robot weight for easy handling, 10 cm robot self-running capability, 100% detonator performance, decontamination factor (DF) of 100 and 8,000 cm2·hr−1 decontamination speed, better than that of TWI (7,500 cm2·hr−1). Hence, the micro-blast type scabbling technology is a suitable method for concrete decontamination. As the Korean explosives industry is well developed and robot and mapping systems are supported by government research and development, this scabbling technology can efficiently aid the Korean decommissioning industry.
        4,300원
        7.
        2020.03 KCI 등재 SCOPUS 구독 인증기관 무료, 개인회원 유료
        국내 3단계 매립형 처분시설은 2018년도 한국원자력환경공단의 중^저준위 방폐물관리시행계획에 의하면 주로 원전 해체 현장에서 발생하는 극저준위방폐물을 수용하기 위해 2019년 4월부터 2026년 2월까지 총 104,000드럼(2개 트렌치)을 수용 하기 위해 건설이 계획 중이다(총 2,246억원 투입). 이후 총 5개 트렌치에 260,000드럼이 총 34,076 m2의 면적에 단계적으로 수용되며 따라서 현재 한국원자력환경공단은 관련 인수기준을 마련 중에 있다. 극저준위방폐물 처분시설 인수기준의 경우 프랑스, 스페인 등이 전용 처분시설을 운영하면서 자국의 인수기준을 합리적으로 잘 준용하고 있으나 본 논문에서는 해체방 폐물의 처분에 가장 경험이 많은 미국의 처분시설을 고려하여 국내 매립형 처분시설에 우선적으로 반영되어야 할 사항이 있는지 분석하였고 이를 통하여 경주내 3단계 매립형 처분시설의 인수기준 마련에 도움이 되고자 하였다.
        4,300원