검색결과

검색조건
좁혀보기
검색필터
결과 내 재검색

간행물

    분야

      발행연도

      -

        검색결과 4

        1.
        2012.09 구독 인증기관 무료, 개인회원 유료
        Remodeling is an architectural activity that transforms the existing state of specific building which has been aged and cliched into new state overcoming those aged and cliched state. Remodeling can be a means to increase building’s physical life-cycle and also a countermeasure to cope with the changes in use that are from social demand, use and technical development. The performance evaluation on the remodeling tenement shall be done by understanding the performance and state of the building before and after remodeling and then it shall represent the improvement in performance objectively by comparing the differences before and after remodeling. In this aspect, we performed basic research to conduct performance evaluation on the remodeling tenement by comparing and analyzing the performance evaluation and performance certificate systems of Korea and Japan in order to suggest objective evaluation system on the change of tenement building before and after remodeling. Now a performance evaluation system as opposed to new apartment is prepared at a point in time when demand increase of remodeling is expected, and the presentation of performance evaluation as opposed to a whole, now remodeling process is the deficient fact. The process that the propriety of remodeling be inspected before remodeling enforcement here, and prove as opposed to an investment after remodeling as a client, ordering is necessary by all means. A state of an existing house is grasped through performance evaluation of an existing apartment, design performance evaluation of remodeling apartment, under construction evaluation, completion evaluation by this study. And plan of a procedure to provide satisfaction to a resident because a remodeling design to be good for the situation and a demand of a resident and execution were measured, and confirmation evaluated, result performance was shown.
        4,000원
        2.
        2010.03 구독 인증기관 무료, 개인회원 유료
        Recently expanding market for largely scale construction projects, cost management of construction project have been increasingly recognized as an important factor responsible for the project success. But public organizations have been continuously operating the same methods as before in cost estimating, so it raise an issue of reliability for estimated cost. Therefore, this study present a highly reliable model that makes preliminary estimates based quantity data in early design stage. it enables engineers to efficiently manage total cost of project as well as partial cost estimating. This study develop a model of database that is created with historical data conducted by government offices. The model proposed can estirnate a cost for RC Structure in schematic design stage, and it is applied to CBR+GA logics to explore best similar cases. In case of estimating methods used to previous research, it is based on actual cost data. Due to the cost estimating compensated by inflation rate vary in market economic conditions, it will follow as an inevitable consequence of reliability problem. It needs to find better way to ensure accuracy through quantity database. Also, This study has been conducted in attempts to verify the reliability of preliminary estirnation. It is checked for the feasibility of presented model with P-National Tax Service Project aside from the database.
        4,000원
        3.
        2009.09 구독 인증기관 무료, 개인회원 유료
        For new construction, recently, it has expended from physical performance standard to completed apartment' blemish warranty and countermeasure strategy contents. And considering element technology is increasing remodeling’ easiness for deciding operation right or wrong the aged apartment’ re-construction or remodeling. In addition, international standardization of building performance makes rapid progress the point of ISO. In Japan, study of housing commission will be done on a national level for the long commission metropolitan gathering house construction and reproduction technical development, and, already, involving study of approval system of building element made progress. It set the goal performance log index of remodeling’ easiness, it set up component element between a part and public standard type in remodeling. In plan and design phase, it is a precondition that make the performance on the basis of user demand in the whole of Use, maintenance, repair, waste and reuse. Therefore, in the building technology case that development of element technology and practical use are fast in progress, a user is required to evaluate/choice according to performance. And a developer is required to the technical development that aim performance is cleared. The study selected a detailed item about performance item of re-modeling element technique through the requirement which the nations (such as America, England, Japan, etc) and the agencies of foreign countries present and item selection standard, from the point of view where the interest not only the individual but also govemmental politic viewpoint is coming to be higher re-modelling than new construction.
        4,000원
        4.
        2008.03 구독 인증기관 무료, 개인회원 유료
        The renovation project of an apartment building can be classified into four processes: ordering the project stage, planning stage, examination and judgment stage, design stage and construction stage. However, in the domestic renovation business, the project performance process has yet to be made systematic by stage. Of the stages involved in renovation, the design stage is the one that involves very complex roles and business processes of those involved in the project, including the project manager, architect,resident and engineer. In particular, in the design stage, the insufficiency in the ability to utilize the input information by project participants and improper decision making cause various problems in thε subsequent construction and ultimately make it difficult to accomplish a renovation project that fully satisfies the residents. Therefore, the design of renovation is a very important stage to ensure a comprehensive understanding of the project performance process as well as the recognition of the design management technology. For this purpose, we aim to provide design work process in integrated respects and the role and responsibilities of every participant in the project, subject to the renovation design stage.
        4,000원