In this study, the behavior of the existing tunnel was measured by automation system to analyze the characteristics of lining longitudinal cracks. The characteristic of the infusion material which it is applicable to crack repairing was considered by grasping the overall behavior including the temperature and the crack width change, and etc., From this, the reasonable repair period for the complement efficiency enhancement was trying to be determined.
Existing tunnel and digging and construction of the center tunnel wall construction process was, including constructing additional a 2-Arch Tunnel is disadvantageous the workability and workday. In addition, the central wall (girder) due the complex waterproof, multiple, as leaks and has a structure plan requires proper Maintenance Methods.
Heumgyeonggaknu is a water-hammering type automatic water clock which was made by Jang Yeong-Sil in 1438. The water clock that is located in Heumgyeonggaknu consists of Suho which is equipped with 2-stage overflow. Constant water wheel power is generated by supplying a fixed amount of water of Suho to Sususang, and this power is transferred to each floor at the same time. The 1st floor rotation wheel of Gasan consists of the operation structure which has the shape of umbrella ribs. The 2nd floor rotation wheel is made so that the 12 hour signal, Gyeong-Jeom signal, and Jujeon constitute a systematic configuration. The 3rd floor rotation wheel is made so that the signal and rotation of Ongnyeo and four gods can be accomplished. Based on the above conceptual design, this paper analyzed the internal signal generation and power transmission of Heumgyeonggaknu.