As the spread of new and renewable power generation facilities, the fixed investment cost CAPEX(Capital Expenditure) of solar power generation facilities decreases due to continuous technological development, and the impact of O&M costs that determine investment success has increased. For this reason, the importance of technologies such as accuracy of O&M cost calculation through ICT, failure prediction, and predictive maintenance have emerged. In the above paper, based on the cost-breakdown structure design and failure rate model design of the solar power generation facility using engineering estimation method, the maintenance cost of the solar power generation facility, which is a renewable power generation facility, is predicted and the maintenance cost used was compared and confirmed. In addition, the cost-breakdown structure and failure rate model of solar power generation facilities were designed and developed by incorporating them into a new program of economic evaluation of new and renewable power generation facilities.
외부비용은 재화나 서비스가 생산 또는 소비되는 과정에서 제3자에게 부과되는 비용이다. 원자력 발전을 통한 전력생산에 도 외부비용이 발생하며 이들에 대한 연구가 1990년대부터 진행되어 왔다. 비용은 정책결정에 중요한 요소로 전력 생산에 대한 비용 비교를 위해 외부비용이 고려되고 있다. 핵연료주기에서도 선택에 따라 다른 외부비용이 발생되지만 이에 대한 연구는 진행되고 있지 않다. 본 연구에서는 핵연료주기 외부비용 평가 방법 개발을 위해 원자력 발전에 대한 외부비용 평가 방법을 조사하고 분석하였다. 후쿠시마 사고 이전에는 외부비용 연구들은 정상 운전 상태에서의 손상 비용에 초점을 두었 다. 그러나 사고 이후 사고비용이 주요 주제가 되었다. 사고비용을 포함한 외부비용 범위는 여러 연구들에서 다양하게 사용 되었으며 범위에 맞춰 다른 방법들이 적용되었다. 본 연구에서는 이러한 결과들이 비교되었으며 핵연료주기에 따른 외부비 용 추산에 방법적 적용성 판단을 위해 분석되었다.