Due to global climate change, mega-droughts have occurred frequently. Since long-term droughts make it difficult to secure the water resources, water supply needs to be restricted in a reasonable manner. In the event of limited water supply, the waterworks need to develop a restricted water supply strategy. This study showed that analyzing daily water supply could be used to respond to the first stage of a drought. According to an analysis of Korea's major water authorities, there was about 7~21% of room for daily minimum water supply in case of a drought. Restricting the water supply by lowering pressure is a good strategy for local water authorities with high water leakage rate since leakage is inversely dependent with pressure. For this method, it is necessary to quantify water deficiency and pressure at each node using a simulation. Since DDA-based software is not possible to predict changes in demand at nodes with pressure reduction, WaterGEMS, a PDA software, was used to quantitatively predict water shortages and pressures at each node. Locations where water is deficient need to install booster pumps or to be dispatched with water tank truck and bottled water. Without these support, lowering pressure could not be an option for water works. This paper suggests a method for waterworks to plan a drought by lowering pressure to restrict water supply using daily water supply analysis and PDA based simulation.
The water distribution system should be invariably operated on continuous pattern for 24 hours a day. Occasionally, it is not practically possible to operate for 24 hours due to water shortage or financial constraints. Therefore an intermittent water supply is unavoidable in water shortage area and developing countries.But the intermittent water supply can introduce large pressure forces and rapid fluid accelerations into a water supply network. These disturbances may result in new pipe failure, leakage and secondary contamination.This paper proposed an improvement methodology to prevent the disturbances by intermittent water supply. For the study, the hydraulic variation of intermittent flow in water distribution system was measured and analyzed in the field by comparing with simulation of hydraulic model. Installations of control valves such as, pressure reducing and sustaining and air valves were employed for pressure and flow control. The effectiveness of the methods are presented by comparing hydraulic conditions before and after introducing the proposed solutions.
최근의 기후변화에 따른 이상가뭄 발생가능성의 증대와 상수원 오염사고 등으로 인하여 상수관망에 의한 물공급의 중단현상이 자주 발생하고 있다. 상수관망에서 제한급수를 실시하는 이유는 확보된 원수의 양이 절대부족한 경우가 가장 많다. 2008년부터 2009년 초까지 태백권 제한급수는 이 지역의 상수원인 광동댐의 저수량 감소에 기인하며 이는 겨울 가뭄이 심화되었기 때문이다. 이와 같이 제한급수를 시행해야할 상황이 발생하면 급수량을 평시대비해서 줄이게 되며 감소된 급수량에 따라 피해가 발생하게 된다. 따라서 이와 같이 제한된 급수량을 효율적으로 활용하게 되면 기왕에 발생하는 제한급수에 따른 피해를 최소화 할 수 있을 것이다.
본 논문에서는 블록화 시스템으로 구성된 상수관망을 대상으로 개별 블록을 대상으로 제한된 양의 물공급 우선순위를 결정하여 제한급수에 따른 영향을 최소화 할 수 있는 방안을 제시하였다. 제안된 모형의 구성은 블록별 물 수요 특성을 고려하여 선취적 우선순위(Preemptive priority)를 설정한 후 선취적 목표계획(Preemptive Goal Programming)으로 최적해(제한급수의 피해의 최소화 또는 제한급수 효과의 최대화)를 도출하도록 하였다. 수요의 선후 관계가 불분명할 경우 AHP로 가중치를 부여하여 결정하도록 하였다. 목적함수는 모든 블록의 수요 미충족에 대한 벌점의 합을 최소화하도록 식을 구성하였고 주요제약식(constraint)은 배수지의 공급량, 블록별 흐름량, 미충족량 산정등으로 하였다.
수요의 우선순위 요소는 실제 상수관망을 운영하는 지자체와 수자원공사 연구소의 전문가를 대상으로 인터뷰를 통하여 결정하였고 제안된 모형을 가상 블록을 대상으로 적용하여 적용성을 검증하였다. 추후 실제 상수도 사업소 자료를 바탕으로 모형을 적용할 예정이다.